967 promises made by NSE-listed companies have a date the company named that has not arrived yet. Every one shows the promise in the company's own words, the day it comes due, the phrase that date was read out of, and the filing it came from. River does not say which of these is worth owning — it has no view to offer and will not offer one. It shows the record and asks you.
The promises whose date is nearest, counting from today. Every date here is the one the company named itself.
The project envisages training of 350 rural poor youth and placement of 245 rural poor youth.
Comes due 18 Aug 2029 — in about 34 months. From “Estimated 36 Months approx”
Said 18 AUG 2026 · from Rajasthan Skill and Livelihoods Development Corporation · source filing
This is the only dated promise River holds for Compucom Software Limited. No update filed since.
The Work Order has been awarded in the ordinary course of business.
Comes due 18 Aug 2029 — in about 34 months. From “3 (Three) years, as specified in the Work Order”
Said 18 AUG 2026 · from Maharashtra State Road Transport Corporation · source filing
Krystal Integrated Services Limited has made 8 other dated promises.
we see a payback period, which should be around 3 years once the plant is operational in Burkina Faso.
Comes due 18 Aug 2029 — in about 34 months. From “3 years post commissioning”
Said 18 AUG 2026
MANORAMA has made 9 other dated promises. No update filed since.
It may be noted that the orders would be partly manufactured in its plant and would partly be sub-contracted and sold on Mercantile Trade Transaction basis.
Comes due 24 Aug 2029 — in about 34 months. From “Over a period of two to three years”
Said 24 AUG 2026 · from Subsidiary Company · source filing
This is the only dated promise River holds for Ratnamani Metals & Tubes Limited. No update filed since.
WorkOrder. Awarded by AigOfPolice(Provisioning)Odisha
Comes due 30 Aug 2029 — in about 35 months. From “30-AUG-29”
Said 28 JUL 2026 · from Aig Of Police · source filing
Railtel Corporation Of India Limited has made 51 other dated promises, 4 of which have already come due.
The renewed engagement represents a 72% increase in value compared to the previous contract and reflects the customer's continued confidence in Onward Technologies' delivery excellence, digital engineering capabilities, and strategic partnership.
Comes due 31 Aug 2029 — in about 35 months. From “From August 2026 to August 2029”
Said 21 SEP 2026 · source filing
Onward Technologies Limited has made 1 other dated promise. No update filed since.
Respected Sir/ Ma’am, With reference to the subject captioned, we would like to inform you that the Company has received a Letter of Award for Hiring of Services of Gas Compression from Oil and Natural Gas Corporation Limited at Balol GGS-1, Mehsana asset for a period of 3 years.
Comes due 8 Sep 2029 — in about 35 months. From “Three (03) Years”
Said 8 SEP 2026 · from Oil and Natural Gas Corporation Limited · source filing
Deep Industries Limited has made 4 other dated promises, 1 of which has already come due. No update filed since.
The Engineering, Procurement and Construction (EPC) works are proposed to be awarded to DBL, representing a business opportunity valued at approximately INR 1800.00 crore (excluding GST), to be executed over a period of 36 months.
Comes due 9 Sep 2029 — in about 35 months. From “Execution Period: 3 Years Operation Period: 25 years”
Said 9 SEP 2026 · from Petroleum and Natural Gas Regulatory Board (PNGRB) · source filing
Dilip Buildcon Limited has made 10 other dated promises.
Larsen and Toubro Limited for RS.797 Crores (Seven Hundred and Ninety Seven Crores) plus taxes on lowest tender basis for detail engineering, manufacture, supply, construction, erection, commissioning, guarantee run for revamp of Ammonia plant, Thai for reduction in specific ener
Comes due 25 Sep 2029 — in about 35 months. From “36 months”
Said 25 SEP 2026 · from Larsen and Toubro Limited · source filing
This is the only dated promise River holds for Rashtriya Chemicals and Fertilizers Limited. No update filed since.
Limited), a subsidiary company of Panache Digilife Limited has received a work order for Installation, Configuration, Technical Services, Equipment along with Realtime monitoring for Telecom.
Comes due 29 Sep 2029 — in about 36 months. From “Approximately 36 months”
Said 29 SEP 2026 · source filing
This is the only dated promise River holds for Panache Digilife Limited. No update filed since.
No. 49, Block - 1, Vasavi’s Shalom Sky City, Gambheeram (V), Anandapuram (M), E-City, Raviryal (V), Maheswaram (M), Gachibowli, Serilingampally (M), Ranga Reddy (D), Visakhapatnam - 531 163, Andhra Pradesh.
Comes due 30 Sep 2029 — in about 36 months. From “September 2029”
Said 1 OCT 2026 · from Directorate of Electrical Engineering, Naval Head Quarters, Ministry of Defence · source filing
Avantel Limited has made 13 other dated promises, 2 of which have already come due.
Two years from the date of commissioning of the project and extendable up to one year on the same terms and conditions.
Comes due 30 Sep 2029 — in about 36 months. From “30-SEP-29”
Said 31 JUL 2026 · from Indian Railway Catering And Tourism CorporationLimited · source filing
Railtel Corporation Of India Limited has made 51 other dated promises, 4 of which have already come due.