965 promises made by NSE-listed companies have a date the company named that has not arrived yet. Every one shows the promise in the company's own words, the day it comes due, the phrase that date was read out of, and the filing it came from. River does not say which of these is worth owning — it has no view to offer and will not offer one. It shows the record and asks you.
The most recently made promises, newest first. These are the ones nobody else has put a date on yet.
The complete payload shall qualify as a Space-Borne System having potential utilisation for Earth Observation.
Comes due 27 Sep 2027 — in about 11 months. From “delivery date is on or before 27 September 2027”
Said 28 SEP 2026 · from DRDO, Ministry of Defence · source filing
Paras Defence and Space Technologies Limited has made 3 other dated promises. No update filed since.
The same has also been disseminated on the website of the Company at https://ellenbarrie.com/
Comes due 28 Sep 2028 — in about 24 months. From “24 months”
Said 28 SEP 2026 · from Bharat Heavy Electricals Limited (BHEL) · source filing
This is the only dated promise River holds for Ellenbarrie Industrial Gases Limited. No update filed since.
Reservoir for Anakapalli Segment in Anakapalli District, Andhra Pradesh State.
Comes due 28 Sep 2028 — in about 24 months. From “Construction - 24 Months”
Said 28 SEP 2026 · from Rural Water Supply and Sanitation Department · source filing
NCC Limited has made 1 other dated promise.
EPC for DBL (excluding GST) INR 1151.47 crore (excluding GST)
Comes due 28 Sep 2028 — in about 24 months. From “within 24 months”
Said 28 SEP 2026 · source filing
Dilip Buildcon Limited has made 10 other dated promises. No update filed since.
24 Months including approaches from Old Pune Naka to Boramani Naka on NH-65 in Solapur City in the 688.23 HAM 9.66 Km
Comes due 28 Sep 2028 — in about 24 months. From “24 Months and Operation Period 15 years from COD”
Said 28 SEP 2026 · from National Highways Authority of India · source filing
Dilip Buildcon Limited has made 10 other dated promises. No update filed since.
This order from a premier centre of the Indian Space Research Organisation represents a meaningful step in the Company’s stated focus on the Space and Defence sector: Entry into a mission-critical institution: SAC is ISRO’s principal centre for the design of space-borne payload
Comes due 25 Dec 2026 — in about 9 weeks. From “within 90 days”
Said 26 SEP 2026 · from Space Applications Centre · source filing
This is the only dated promise River holds for Silver Touch Technologies Limited. No update filed since.
LetterofAcceptance. Awarded by Central Mine Planning & Design Institute Limited
Comes due 6 Oct 2031 — in about 60 months. From “06-OCT-31”
Said 26 SEP 2026 · from Central Mine Planning & Design Institute Limited · source filing
Railtel Corporation Of India Limited has made 51 other dated promises, 4 of which have already come due.
With this order, the Company's global order book stands at a record USD 4.7 billion (~₹45,000 crore), the highest in its history.
Comes due 31 Mar 2028 — in about 18 months. From “during FY28”
Said 25 SEP 2026 · source filing
Welspun Corp Limited has made 1 other dated promise, 1 of which has already come due. No update filed since.
Design and Build, GMP Contract. Awarded by Qualcomm India Private Limited
Comes due 25 Mar 2029 — in about 29 months. From “within 30 months”
Said 25 SEP 2026 · from Qualcomm India Private Limited · source filing
Vascon Engineers Limited has made 5 other dated promises.
Larsen and Toubro Limited for RS.797 Crores (Seven Hundred and Ninety Seven Crores) plus taxes on lowest tender basis for detail engineering, manufacture, supply, construction, erection, commissioning, guarantee run for revamp of Ammonia plant, Thai for reduction in specific ener
Comes due 25 Sep 2029 — in about 36 months. From “36 months”
Said 25 SEP 2026 · from Larsen and Toubro Limited · source filing
This is the only dated promise River holds for Rashtriya Chemicals and Fertilizers Limited. No update filed since.
License of the Kadaya Block situated at village Kadaya, Taluka Maliya Hatina, District
Comes due 7 Nov 2026 — in 15 days. From “within 45 days”
Said 23 SEP 2026 · source filing
This is the only dated promise River holds for GHCL Limited. No update filed since.
Oswal Pumps Wins ₹273.19 Crore Order from TGREDCO for 46.7 MW Rooftop Solar Project Across 9,937 Government
Comes due 22 Mar 2027 — in about 5 months. From “within 180 days”
Said 23 SEP 2026 · from Telangana Renewable Energy Development Corporation Limited · source filing
Oswal Pumps Limited has made 4 other dated promises, 2 of which have already come due. No update filed since.