965 commitments from NSE-listed companies have a date the company named that has not yet arrived. Each card carries the claim in the company's own words, the date, the phrase the date was read out of, and the filing. River does not say which of these is worth owning — it has no view to offer and will not offer one. It shows the record and asks you.
Ordered by the rupee figure in the filing, largest first. Only commitments that stated one.
To, To, The General Manager, Manager-Listing Compliance, Department of Corporate National Stock Exchange of India
Comes due 11 Mar 2029 — in about 29 months. From “3 Years / 36 Months”
Said 11 MAR 2026 · from Ministry of Road Transport and Highways · source filing
Ceigall India Limited has 13 other dated commitments on the Clock, 1 of which has already come due.
Execution of Civil (earthwork, bridges, and Item Rate/ 519.33 18 months
Comes due 13 Oct 2027 — in about 12 months. From “18 months”
Said 13 APR 2026 · from Mirzapur Thermal Energy (UP) Private Limited · source filing
H.G. Infra Engineering Limited has 4 other dated commitments on the Clock.
56.328 - 56.432 km on NH-107 & 81.240 to 81.550 km) on NH-107A in the state of Uttarakhand under Annual Plan
Comes due ≈ 30 Jun 2027 — in about 8 months. From “12 Months from the appointed date”
The filing counts from a date it names but does not give, so River has measured from the filing date. This day is River's reading, not the company's.
Said 30 JUN 2026 · from MSIDC (Maharashtra State Infrastructure Corporation Limited) · source filing
SRM Contractors Limited has 2 other dated commitments on the Clock. The company has filed nothing further on River's record since.
Pace Digitek Limited (Formerly Known as Pace Digitek Private Limited and Pace Digitek Infra Private Limited)
Comes due 30 Jun 2027 — in about 8 months. From “within 15 Months”
Said 30 MAR 2026 · from NTPC Limited · source filing
Pace Digitek Limited has 5 other dated commitments on the Clock, 1 of which has already come due.
GPTINFRA Bags Order Valued at ₹ 483.72 Crore
Comes due ≈ 21 Dec 2026 — in about 8 weeks. From “1,095 days from Appointed Date”
The filing counts from a date it names but does not give, so River has measured from the filing date. This day is River's reading, not the company's.
Said 17 SEP 2026 · from Chief Project Manager, Rail Vikas Nigam Limited, Bhubaneshwar · source filing
GPT Infraprojects Limited has 6 other dated commitments on the Clock.
Package 6 - Construction of Nashik Ring Road (Southern side) from Design chainage 14.950 to 28.970 (Length 14.020km) under EPC mode. Awarded by MSIDC (Maharashtra State Infrastructure Development Corporation Limited)
Comes due ≈ 4 Apr 2027 — in about 5 months. From “12 Months from the appointed date”
The filing counts from a date it names but does not give, so River has measured from the filing date. This day is River's reading, not the company's.
Said 4 APR 2026 · from MSIDC (Maharashtra State Infrastructure Development Corporation Limited) · source filing
SRM Contractors Limited has 2 other dated commitments on the Clock.
The same has also been disseminated on the website of the Company at https://ellenbarrie.com/
Comes due 28 Sep 2028 — in about 24 months. From “24 months”
Said 28 SEP 2026 · from Bharat Heavy Electricals Limited (BHEL) · source filing
The only dated commitment River holds for Ellenbarrie Industrial Gases Limited. The company has filed nothing further on River's record since.
With reference to the subject cited above, we are pleased to inform you that Chittaranjan Locomotive Works, Chittaranjan, Barddhaman (hereinafter referred as "CLW") has awarded an order valued at Rs_ 475.21 Crores to the Company for the Supply, Installation, Testing and Commissio
Comes due ≈ 27 May 2027 — in about 7 months. From “12 months from the date of contract”
The filing counts from a date it names but does not give, so River has measured from the filing date. This day is River's reading, not the company's.
Said 27 MAY 2026 · from Chittatanjan Locomotive Works ("CLW") · source filing
The only dated commitment River holds for Kernex Microsystems (India) Limited.
In line with the SEBI circular dated September 9, 2015, read with circular dated July 13, 2023, the relevant details pertaining to the said contract are specified herein below: Sl.
Comes due 25 Mar 2029 — in about 29 months. From “3 Years”
Said 25 MAR 2026 · from Zetwerk Manufacturing Businesses Limited · source filing
Avantel Limited has 13 other dated commitments on the Clock, 2 of which have already come due.
Engineering Department, Hyderabad, Telangana for execution of work on Water Supply Improvement
Comes due 29 Apr 2028 — in about 18 months. From “24 months”
Said 29 APR 2026 · from Public Health & Municipal · source filing
Indian Hume Pipe Company Limited has 3 other dated commitments on the Clock.
REQUEST FOR PROPOSAL FOR SELECTION OF SYSTEM INTEGRATORFORKSWAN3.0. Awarded by CentreForE-Governance
Comes due 26 Mar 2031 — in about 54 months. From “26-MAR-31”
Said 27 MAR 2026 · from Centre For E-Governance · source filing
Railtel Corporation Of India Limited has 51 other dated commitments on the Clock, 4 of which have already come due.
Diamond Power Infrastructure Ltd (“DICABS”; BSE: 522163, NSE: DIACABS), one of India’s integrated manufacturers of power cables and conductors, has received a supply order valued at Rs. 435.71 crore (exclusive of GST) for the supply of High Tension (HT) and Low Tension (LT) power
Comes due 31 Mar 2027 — in about 5 months. From “by March 2027”
Said 5 JUL 2026 · from Larsen &Toubro Ltd (HYD22 & 23), Sterling and Wilson Ltd · source filing
Diamond Power Infrastructure Limited has 5 other dated commitments on the Clock, 1 of which has already come due.