978 promises made by NSE-listed companies have a date the company named that has not arrived yet. Every one shows the promise in the company's own words, the day it comes due, the phrase that date was read out of, and the filing it came from. River does not say which of these is worth owning — it has no view to offer and will not offer one. It shows the record and asks you.
The promises whose date is nearest, counting from today. Every date here is the one the company named itself.
Engagement of user fee agency on the basis of competitive bidding at Mangapatnam Fee Plaza at Tadipatri to Jammalamadugu via Muddanur of NH-67 in the state of Andhra Pradesh and upkeep/maintenance of adjacent
Comes due 3 Sep 2027 — in about 10 months. From “1 year”
Said 3 SEP 2026 · from NHAI (National Highways Authority of India) · source filing
Innovision Limited has made 23 other dated promises.
430+380, along with Approaches and Service Roads near college square and DRDA square in Puintola to Icchapuram section of NH-16 in state of Odisha on EPC mode.
Comes due 4 Sep 2027 — in about 10 months. From “18 Months”
Said 4 MAR 2026 · from National Highways Authority of India · source filing
A B Infrabuild Limited has made 3 other dated promises.
Signaling & Telecom arrangements in connection with yard remodeling of Guntur Junction and Automatic Block Signaling System between GNT-NLPD Section in GunturDi. Awarded by Dy.Cste/Projects/Bza
Comes due 4 Sep 2027 — in about 10 months. From “04-SEP-27”
Said 14 MAR 2026 · source filing
Railtel Corporation Of India Limited has made 53 other dated promises, 4 of which have already come due.
Sigma-, Corporales, corporate House No, Sindhu Bhavan Road Nr ~,'ann Party Plot Cross Road Bodakdev A,hmedabad ' J80 054, GUjarat India, Te'efax : +91 - 7G
Comes due 5 Sep 2027 — in about 11 months. From “18 months”
Said 5 MAR 2026 · from Dakshin Gujarat Vij Co. Ltd · source filing
HEC Infra Projects Limited has made 5 other dated promises, 1 of which has already come due.
Nature of order(s) / contract(s) Comprehensive Signalling and Telecommunication Works for Provision of Automatic Block Signalling System. Awarded by South Central Railway
Comes due ≈ 7 Sep 2027 — in about 11 months. From “within 480 days from the Appointed Date”
The filing counts from a date it names but does not give, so River has measured from the filing date. This day is River's reading, not the company's.
Said 15 MAY 2026 · from South Central Railway · source filing
Texmaco Rail & Engineering Limited has made 23 other dated promises, 5 of which have already come due.
Engagement of user fee collection agency on the basis of competitive bidding though E-Tender for Pachwara fee plaza of NH-39 for four laning of Jhansi Khajuraho Section in the state of Madhya Pradesh and upkeep/maintenance of adjacent toilet blocks including recouping the consuma
Comes due 8 Sep 2027 — in about 11 months. From “1 year”
Said 8 SEP 2026 · from NHAI (National Highways Authority of India) · source filing
Innovision Limited has made 23 other dated promises.
The estimated order value of the Work awarded (excluding TCS) is approximately Rs. 2,838.88 lakhs (Rupees Two Thousand Eight Hundred and Thirty-Eight Lakhs Only).
Comes due 9 Sep 2027 — in about 11 months. From “1 Year”
Said 9 SEP 2026 · from National Highways Authority of India · source filing
EMS Limited has made 7 other dated promises.
Paras Defence and Space Technologies Limited (“PARAS”), has received an order from DRDO, Ministry of Defence valued at approximately Rs. 80.28 Cr.
Comes due 9 Sep 2027 — in about 11 months. From “Execution within 18 Months from the Date of Supply Order”
Said 9 MAR 2026 · from DRDO, Ministry of Defence · source filing
Paras Defence and Space Technologies Limited has made 3 other dated promises.
Station buildings), and P-way works for BOQ development of Railway Infrastructure at 2x800
Comes due 10 Sep 2027 — in about 11 months. From “18 months”
Said 10 MAR 2026 · from Anuppur Thermal Energy (MP) Private Limited · source filing
H.G. Infra Engineering Limited has made 4 other dated promises.
GPTINFRA Bags Order Valued at ₹ 85.53 Crore
Comes due ≈ 12 Sep 2027 — in about 11 months. From “12 months from LOA”
The filing counts from a date it names but does not give, so River has measured from the filing date. This day is River's reading, not the company's.
Said 12 SEP 2026 · from CSTE Con, Eastern Railway, Kolkata · source filing
GPT Infraprojects Limited has made 7 other dated promises.
VA TECH WABAG (‘WABAG’), a leading pure-play water technology Indian multinational group, has secured a Letter of Award (‘LoA’) from the Chennai Metropolitan Water Supply and Sewerage Board (‘CMWSSB’) for the Refurbishment, Finance, Operate, Maintain and Transfer (‘RFOMT’) of a 4
Comes due 12 Sep 2027 — in about 11 months. From “within a period of 18 months”
Said 12 MAR 2026 · from Chennai Metropolitan Water Supply and Sewerage Board (‘CMWSSB’) · source filing
VA Tech Wabag Limited has made 7 other dated promises.
“Construction of Diversion Road from 4/700 km to 11/500 km of Duduka-Gopalpur-Toparia Road (6 Lane with Service Road) in the District of Sundargarh on EPC Mode". Awarded by Odisha Bridge & Construction Corporation Limited (OBCCL)
Comes due 14 Sep 2027 — in about 11 months. From “18 Months”
Said 14 MAR 2026 · from Odisha Bridge & Construction Corporation Limited (OBCCL) · source filing
Dilip Buildcon Limited has made 10 other dated promises.