What have Indian listed companies promised, and when is it due?

965 promises made by NSE-listed companies have a date the company named that has not arrived yet. Every one shows the promise in the company's own words, the day it comes due, the phrase that date was read out of, and the filing it came from. River does not say which of these is worth owning — it has no view to offer and will not offer one. It shows the record and asks you.

Ordered by the rupee figure in the filing, largest first, and only promises that stated one. This ranks the figure and not its importance: a large order can matter less to a large company than a small one does to a small company.

Sterlite Technologies LimitedorderINR 960 cr

Sterlite Technologies Limited (the Company’ or ‘STL’) has received an order from Domestic Telecom Operator.

Comes due 1 Aug 2028 — in about 22 months. From “to be executed 2 years”

Said 1 AUG 2026 · from Domestic Telecom Operator · source filing

Sterlite Technologies Limited has made 2 other dated promises.

Ceigall India LimitedorderRs. 918.04 Crores

● Project awarded by Jaipur Metro Rail Corporation Ltd to be executed over 34 months New Delhi, May 2, 2026: Ceigall India Limited (CIL), through its joint venture CIL–SAM India JV, has received a Letter of Acceptance (LOA) from Jaipur Metro Rail Corporation Ltd for the design an

Comes due 2 Mar 2029 — in about 29 months. From “34 Months”

Said 2 MAY 2026 · from Jaipur Metro Rail Corporation Ltd · source filing

Ceigall India Limited has made 13 other dated promises, 1 of which has already come due.

Patel Engineering LimitedorderRs. 910.08 crores

Project (PKG1) of Rs. 910.08 crores from HPPCL Ltd

Comes due 19 Sep 2028 — in about 23 months. From “to be completed within a timeline of 30 months”

Said 19 MAR 2026 · from HPPCL Ltd · source filing

Patel Engineering Limited has made 2 other dated promises.

Patel Engineering LimitedorderRs. 910.08 crores

The project, located at Village Dadahu, Tehsil Renuka, District Sirmaur, Himachal Pradesh, is scheduled to be completed within a timeline of 30 months.

Comes due 23 Aug 2028 — in about 22 months. From “30 months”

Said 23 FEB 2026 · from Himachal Pradesh Power Corporation Limited (HPPCL) · source filing

Patel Engineering Limited has made 2 other dated promises.

Rashtriya Chemicals and Fertilizers LimitedorderRS.797 Crores

Larsen and Toubro Limited for RS.797 Crores (Seven Hundred and Ninety Seven Crores) plus taxes on lowest tender basis for detail engineering, manufacture, supply, construction, erection, commissioning, guarantee run for revamp of Ammonia plant, Thai for reduction in specific ener

Comes due 25 Sep 2029 — in about 36 months. From “36 months”

Said 25 SEP 2026 · from Larsen and Toubro Limited · source filing

This is the only dated promise River holds for Rashtriya Chemicals and Fertilizers Limited. No update filed since.

Krystal Integrated Services LimitedorderRs. 7,40,06,30,000 Crore

The aggregate contract value of the two work orders is Rs. 7,40,06,30,000 Crore, including

Comes due 10 Aug 2028 — in about 22 months. From “2 (Two) years”

Said 10 AUG 2026 · source filing

Krystal Integrated Services Limited has made 8 other dated promises.

Indian Hume Pipe Company LimitedorderRs.738.61 Crores

Item Rate Contract – Design and Build, operation and maintenance. Awarded by Public Health Engineering Department (PHED), (Office of the Chief Engineer, JICA Funded Projects), Jaipur, Government of Rajasthan

Comes due 3 Jul 2028 — in about 21 months. From “24 months”

Said 3 JUL 2026 · from Public Health Engineering Department · source filing

Indian Hume Pipe Company Limited has made 3 other dated promises. No update filed since.

Pace Digitek LimitedorderRs. 7,099.19 Million

Pace Digitek Limited (Formerly Known as Pace Digitek Private Limited and Pace Digitek Infra Private Limited)

Comes due 16 May 2027 — in about 7 months. From “to be executed entire capacity will be 12 months”

Said 16 MAY 2026 · from NLC India Renewables Limited · source filing

Pace Digitek Limited has made 5 other dated promises, 1 of which has already come due.

Ceigall India LimitedorderRs. 704.70 Crore

To, To, The General Manager, Manager-Listing Compliance, Department of Corporate National Stock Exchange of India

Comes due 24 Aug 2030 — in about 47 months. From “48 Month Construction Period & 05 Year Maintenance Period”

Said 24 AUG 2026 · from Ministry of Road Transport & Highways (“MoRTH”) · source filing

Ceigall India Limited has made 13 other dated promises, 1 of which has already come due.

Ceigall India LimitedorderRs. 704.70 Crore

To, To, The General Manager, Manager-Listing Compliance, Department of National Stock Exchange of Corporate Services, India Limited, Exchange

Comes due 8 Jul 2030 — in about 45 months. From “48 Month Construction Period & 05 Year Maintenance Period”

Said 8 JUL 2026 · from Ministry of Road Transport and Highways · source filing

Ceigall India Limited has made 13 other dated promises, 1 of which has already come due.

Bajel Projects Limitedorder700 Crore

Bajel Projects Secures a 700 Crore+^ Ultra-Mega Order* from MSETCL for 400/220 kV Substation at Saswad, Pune

Comes due ≈ 13 Feb 2028 — in about 16 months. From “23 Months from the date of issuance of Notification of Award”

The filing counts from a date it names but does not give, so River has measured from the filing date. This day is River's reading, not the company's.

Said 13 MAR 2026 · from MSETCL · source filing

Bajel Projects Limited has made 7 other dated promises.

Dilip Buildcon LimitedorderINR 698.49 Cr

“Construction of the Flood Protection Embankment on river Narmada, District Bharuch (Engineering, Procurement and Construction Basis-EPC)”. Awarded by Narmada Water Resources Water Supply & Kalpasar Department, Government of Gujarat

Comes due 28 Mar 2028 — in about 17 months. From “24 Months”

Said 28 MAR 2026 · from Narmada Water Resources Water Supply & Kalpasar Department · source filing

Dilip Buildcon Limited has made 10 other dated promises.

A promise here means something a company stated, not something it owes anyone. Schedules get revised, scope changes, and an order extended by agreement is an ordinary commercial event. River records what was said and when it comes due — never whether it was kept. It does not score, rate, rank, recommend or forecast, and it is not a registered investment adviser.