Promises on the record

What have Indian listed companies promised, and when is it due?

968 promises made by NSE-listed companies have a date the company named that has not arrived yet. Every one shows the promise in the company's own words, the day it comes due, the phrase that date was read out of, and the filing it came from. River does not say which of these is worth owning — it has no view to offer and will not offer one. It shows the record and asks you.

Ordered by the rupee figure in the filing, largest first, and only promises that stated one. This ranks the figure and not its importance: a large order can matter less to a large company than a small one does to a small company.

Ceinsys Tech LimitedorderRs.28,17,42,382.20/-

on September 10, 2026, Letter of Award for Design, Supply, Installation, Testing & Commissioning of Station RTU, FRTU/ Remote IO module and other allied equipment's for the visibility of 132/110/100kV, 125 Nos.

Comes due 10 Sep 2030 — in about 47 months. From “48 Months (24 Months Execution and 24 months Warranty)”

Said 10 SEP 2026 · from Rite Water Solutions (India) Limited · source filing

Ceinsys Tech Limited has made 8 other dated promises, 2 of which have already come due.

Texmaco Rail & Engineering LimitedorderRs. 27.82 crores

Supply of 1 BTAP rake alongwith 1 Brake Van for Aditya Expansion Project

Comes due 10 May 2027 — in about 7 months. From “Within 8 months from the date of PO”

Said 10 SEP 2026 · from Hindalco Industries Limited · source filing

Texmaco Rail & Engineering Limited has made 23 other dated promises, 5 of which have already come due. No update filed since.

Texmaco Rail & Engineering LimitedorderRs. 27.82 crores

Supply of 1 BTAP rake and one Brake Van. Awarded by Hindalco Industries Limited

Comes due 8 Mar 2027 — in about 5 months. From “Within 10 months from the date of PO”

Said 8 MAY 2026 · from Hindalco Industries Limited · source filing

Texmaco Rail & Engineering Limited has made 23 other dated promises, 5 of which have already come due.

Refex Industries LimitedorderINR 27.475 Crore

fugitive-ash controls, and unloading at designated chainages of road projects, flyover embankments and other government-approved construction sites.

Comes due 18 Aug 2027 — in about 10 months. From “12 months”

Said 18 AUG 2026 · source filing

Refex Industries Limited has made 8 other dated promises.

Railtel Corporation Of India LimitedorderRs. 26,72,60,140/-

Supply, transportation, trenching, laying, backfilling, Horizontal directional drilling, HDPE pipe insertion, blowing, jointing & terminationofOFC. Awarded by SouthEastCentralRailway

Comes due 5 Mar 2027 — in about 4 months. From “05-MAR-27”

Said 7 MAR 2026 · from South East Central Railway · source filing

Railtel Corporation Of India Limited has made 52 other dated promises, 4 of which have already come due.

Paras Defence and Space Technologies LimitedorderRs.26.59 crore

The complete payload shall qualify as a Space-Borne System having potential utilisation for Earth Observation.

Comes due 27 Sep 2027 — in about 11 months. From “delivery date is on or before 27 September 2027”

Said 28 SEP 2026 · from DRDO, Ministry of Defence · source filing

Paras Defence and Space Technologies Limited has made 3 other dated promises. No update filed since.

Dev Information Technology LimitedorderINR 26 Crore

The total value of the order is approximately INR 26 Crore.

Comes due 9 Apr 2029 — in about 30 months. From “to be executed;– Approximately 3 Years”

Said 9 APR 2026 · from National Informatics Centre Services · source filing

Dev Information Technology Limited has made 3 other dated promises.

Ashoka Buildcon LimitedorderRs.25.51 Crore

Package-3: Supply, Erection, Testing & Commissioning of Electro Mechanical (E&M) System comprising of 33/11kv & 11/0.433kv GIS Substations, HT & LT Cables, DG Sets, Lighting, Ups System, Ventilation Systems & Fire Fighting Systems and other associated works for Tunnel T-13, T-14,

Comes due ≈ 28 Feb 2029 — in about 29 months. From “Completion Period: 30 months from date of commencement”

The filing counts from a date it names but does not give, so River has measured from the filing date. This day is River's reading, not the company's.

Said 29 AUG 2026 · from Rail Vikas Nigam Limited, vide LOA dated August 28, 2026 · source filing

Ashoka Buildcon Limited has made 4 other dated promises.

Neueon Corporation LimitedorderRs. 25 crores

Nature of orders Campus Civil Renovation Works – Hospital, College and Other Areas e.

Comes due 31 Mar 2027 — in about 5 months. From “Deliverables to be completed by March 31, 2027”

Said 30 SEP 2026 · from Share Medical Care Foundation · source filing

This is the only dated promise River holds for Neueon Corporation Limited. No update filed since.

Magellanic Cloud LimitedorderINR 25 Crore

Bagging/Receiving of Orders/Contracts

Comes due 24 Mar 2031 — in about 54 months. From “5 years”

Said 24 MAR 2026 · from Punjab & Sind Bank · source filing

Magellanic Cloud Limited has made 12 other dated promises.

Dynacons Systems & Solutions LimitedorderRs. 25 Crores

Dynacons Secures Prestigious Project from Jammu & Kashmir Bank for Enterprise

Comes due 7 Apr 2031 — in about 54 months. From “5 years”

Said 7 APR 2026 · from Jammu & Kashmir Bank · source filing

Dynacons Systems & Solutions Limited has made 4 other dated promises.

Railtel Corporation Of India LimitedorderRs. 24,91,19,240/-

Purchase Order for the Procurement of AI/ML Based Solution for Monitoring and Investigation of Fraud, Waste & Abuse of HealthInsuranceClaims. Awarded by TheNewIndiaAssuranceCompanyLtd

Comes due 6 May 2029 — in about 31 months. From “06-MAY-29”

Said 8 MAY 2026 · source filing

Railtel Corporation Of India Limited has made 52 other dated promises, 4 of which have already come due.

A promise here means something a company stated, not something it owes anyone. Schedules get revised, scope changes, and an order extended by agreement is an ordinary commercial event. River records what was said and when it comes due — never whether it was kept. It does not score, rate, rank, recommend or forecast, and it is not a registered investment adviser.