  "source_name": "River",
  "canonical": "https://withriver.in/clock/2027-10",
  "description": "17 dated commitments from 15 NSE-listed companies falling due in October 2027, each with the company's own words and the filing it came from.",
  "method": "Every row is a date an Indian listed company stated in a filing with the NSE, resolved to a calendar day from the company's own words. The phrase the date was read out of is given as date_basis so the resolution can be checked. date_is_approximate is true where the company counted from a date it did not state -- 'within 18 months of the appointed date' -- in which case River counted from the filing date and marks it rather than presenting an estimate as a stated date. Nothing here says whether the commitment was met: a listed company must disclose winning an order, and amending or terminating one, but is not required to disclose completing one.",
  "license": "Free to quote and reproduce with attribution to River (withriver.in). Underlying documents are public filings of the National Stock Exchange of India.",
  "attribution": "River — withriver.in",
  "generated_at": "2026-10-28T15:22:07.219Z",
  "period": "2027-10",
  "period_label": "October 2027",
  "period_has_ended": false,
  "totals": {
    "commitments": 17,
    "companies": 15,
    "order_delivery_windows": 17,
    "management_statements": 0,
    "dates_resolved_from_an_assumed_anchor": 3,
    "value_inr_crore": 3550.35,
    "commitments_with_a_stated_value": 12
  },
  "commitments": [
    {
      "symbol": "LASERPOWER",
      "company_name": "Laser Power & Infra Limited",
      "kind": "order",
      "said_on": "2026-10-01",
      "due_on": "2027-10-01",
      "date_basis": "Within 12 months from the notification of the Award",
      "date_is_approximate": false,
      "statement": "Bagging/Receiving of orders/contracts: Sl.",
      "value_text": "₹72.77 crores",
      "counterparty": "Power Grid Corporation of India Limited",
      "source_filing": "https://nsearchives.nseindia.com/corporate/LASERPOWER_01102026231212_Intimation_01102026.pdf",
      "company_page": "https://withriver.in/won/LASERPOWER"
    },
    {
      "symbol": "ASTRAMICRO",
      "company_name": "Astra Microwave Products Limited",
      "kind": "order",
      "said_on": "2026-04-02",
      "due_on": "2027-10-02",
      "date_basis": "Within 18 months",
      "date_is_approximate": false,
      "statement": "Receipt of order by Astra Rafael Comsys Private Limited, Joint Venture Company.",
      "value_text": "Rs. 250.58 crores",
      "counterparty": "Hindustan Aeronautics Limited",
      "source_filing": "https://nsearchives.nseindia.com/corporate/ASTRAMICRO_02042026112318_ARCbaggingLet.pdf",
      "company_page": "https://withriver.in/won/ASTRAMICRO"
    },
    {
      "symbol": "MARINE",
      "company_name": "Marine Electricals (India) Limited",
      "kind": "order",
      "said_on": "2026-04-06",
      "due_on": "2027-10-06",
      "date_basis": "over a period of 18 months",
      "date_is_approximate": false,
      "statement": "We are pleased to announce that Marine Electricals (India) Limited has received orders totaling Rs. 115 crores (excluding taxes) from Larsen & Toubro Limited.",
      "value_text": "Rs. 115 crores",
      "counterparty": "Larsen & Toubro Limited",
      "source_filing": "https://nsearchives.nseindia.com/corporate/MARINE_06042026150117_Stock_Signed_Exchange_Intimation_LT.pdf",
      "company_page": "https://withriver.in/won/MARINE"
    },
    {
      "symbol": "ADVAIT",
      "company_name": "Advait Energy Transitions Limited",
      "kind": "order",
      "said_on": "2026-07-07",
      "due_on": "2027-10-07",
      "date_basis": "15 Months",
      "date_is_approximate": false,
      "statement": "Kalyan Yojana-2 (VKY-2) Scheme / or other scheme of ₹ 51,61,56,375.00/- on July 6, 2026.",
      "value_text": "₹ 51,61,56,375.00/-",
      "counterparty": "DAKSHIN GUJARAT VIJ CO. LTD. (DGVCL)",
      "source_filing": "https://nsearchives.nseindia.com/corporate/ADVAITENERGY_07072026162100_SEintimation_DGVCL_s.pdf",
      "company_page": "https://withriver.in/won/ADVAIT"
    },
    {
      "symbol": "VIVIANA",
      "company_name": "Viviana Power Tech Limited",
      "kind": "order",
      "said_on": "2026-07-07",
      "due_on": "2027-10-07",
      "date_basis": "15 (Fifteen) Months from the Date of LOA",
      "date_is_approximate": true,
      "statement": "15 (Fifteen) Months from the Date of LOA is to be executed",
      "value_text": null,
      "counterparty": "Dakshin Gujarat Vij Company Limited (DGVCL)",
      "source_filing": "https://nsearchives.nseindia.com/corporate/VIVIANA_07072026132100_VIVIANA__Intimation_of_Receiving_Order_DGVCL_07072026.pdf",
      "company_page": "https://withriver.in/won/VIVIANA"
    },
    {
      "symbol": "WABAG",
      "company_name": "VA Tech Wabag Limited",
      "kind": "order",
      "said_on": "2026-09-07",
      "due_on": "2027-10-07",
      "date_basis": "13 months",
      "date_is_approximate": false,
      "statement": "Technology Group, secured a ‘Medium’ order from the Reliance Industries Limited (‘RIL’), towards",
      "value_text": "250 Crores",
      "counterparty": "Reliance Industries Limited (‘RIL’)",
      "source_filing": "https://nsearchives.nseindia.com/corporate/VATECH_07092026080746_SEIntimationRIL070926.pdf",
      "company_page": "https://withriver.in/won/WABAG"
    },
    {
      "symbol": "INNOVISION",
      "company_name": "Innovision Limited",
      "kind": "order",
      "said_on": "2026-10-09",
      "due_on": "2027-10-09",
      "date_basis": "1 year",
      "date_is_approximate": false,
      "statement": "Manpower Services (Version 2.0)- Office/Commercial/Institution/Residential; Security Marshal (Bouncer) from Health and Family Welfare Department Chhattisgarh (Directorate of Medical Education).",
      "value_text": null,
      "counterparty": "Health and Family Welfare Department Chhattisgarh",
      "source_filing": "https://nsearchives.nseindia.com/corporate/INNOVISION2007_09102026155306_Workorder_Manpower_Chattisgarh_Health_Deptt_091026_Signed.pdf",
      "company_page": "https://withriver.in/won/INNOVISION"
    },
    {
      "symbol": "KRYSTAL",
      "company_name": "Krystal Integrated Services Limited",
      "kind": "order",
      "said_on": "2026-09-29",
      "due_on": "2027-10-11",
      "date_basis": "1 year from October 12, 2026 to October 11, 2027",
      "date_is_approximate": false,
      "statement": "The aggregate contract value is Rs. 8,75,40,000/- excluding all applicable taxes.",
      "value_text": "Rs. 8,75,40,000/-",
      "counterparty": "Kosol Energie Private Limited",
      "source_filing": "https://nsearchives.nseindia.com/corporate/KISL123_29092026174525_Reg_30_intimation.pdf",
      "company_page": "https://withriver.in/won/KRYSTAL"
    },
    {
      "symbol": "IRCON",
      "company_name": "Ircon International Limited",
      "kind": "order",
      "said_on": "2026-10-12",
      "due_on": "2027-10-12",
      "date_basis": "365 days",
      "date_is_approximate": false,
      "statement": "बीएसई िलिमटेड नेशनल (cid:720)ॉक ए(cid:411)च(cid:336)ज ऑफ इंिडया िलिमटेड",
      "value_text": null,
      "counterparty": "East Central Railway",
      "source_filing": "https://nsearchives.nseindia.com/corporate/IRCON_12102026180029_STXINTIMATIONsigned.pdf",
      "company_page": "https://withriver.in/won/IRCON"
    },
    {
      "symbol": "HGINFRA",
      "company_name": "H.G. Infra Engineering Limited",
      "kind": "order",
      "said_on": "2026-04-13",
      "due_on": "2027-10-13",
      "date_basis": "18 months",
      "date_is_approximate": false,
      "statement": "Execution of Civil (earthwork, bridges, and Item Rate/ 519.33 18 months",
      "value_text": "Rs. 519.33 crore",
      "counterparty": "Mirzapur Thermal Energy (UP) Private Limited",
      "source_filing": "https://nsearchives.nseindia.com/corporate/HGINFRA_13042026175915_FinalIntimation.pdf",
      "company_page": "https://withriver.in/won/HGINFRA"
    },
    {
      "symbol": "INNOVISION",
      "company_name": "Innovision Limited",
      "kind": "order",
      "said_on": "2026-10-22",
      "due_on": "2027-10-22",
      "date_basis": "1 year",
      "date_is_approximate": false,
      "statement": "Awarding of order(s)/contract(s) — Innovision Limited has informed the Exchange about Awarding of order(s)/contract(s)",
      "value_text": null,
      "counterparty": null,
      "source_filing": "https://nsearchives.nseindia.com/corporate/INNOVISION2007_22102026172825_Workorder_Limha_Chatisgarh_Toll_221026_signed.pdf",
      "company_page": "https://withriver.in/won/INNOVISION"
    },
    {
      "symbol": "HILINFRA",
      "company_name": "Highway Infrastructure Limited",
      "kind": "order",
      "said_on": "2026-10-23",
      "due_on": "2027-10-23",
      "date_basis": "1 Year (One Year)",
      "date_is_approximate": false,
      "statement": "Bagging/Receiving of orders/contracts — Highway Infrastructure Limited has informed the Exchange about Bagging/Receiving of orders/contracts",
      "value_text": null,
      "counterparty": null,
      "source_filing": "https://nsearchives.nseindia.com/corporate/HIGHWAY123_23102026204654_HIL_Reg30_Palayam_231026.pdf",
      "company_page": "https://withriver.in/won/HILINFRA"
    },
    {
      "symbol": "OLECTRA",
      "company_name": "Olectra Greentech Limited",
      "kind": "order",
      "said_on": "2026-02-23",
      "due_on": "2027-10-23",
      "date_basis": "These Buses shall be delivered over a period of 20 months",
      "date_is_approximate": false,
      "statement": "EVEY shall procure these buses from Olectra Greentech Limited (\"Olectra\"), which shall be delivered over a period of 20 months.",
      "value_text": "Rs. 1,800 Crores",
      "counterparty": "Telangana State Road Transport Corporation (TGSRTC)",
      "source_filing": "https://nsearchives.nseindia.com/corporate/OLECTRA_23022026134301_Intimation23022026.pdf",
      "company_page": "https://withriver.in/won/OLECTRA"
    },
    {
      "symbol": "HILINFRA",
      "company_name": "Highway Infrastructure Limited",
      "kind": "order",
      "said_on": "2026-10-26",
      "due_on": "2027-10-26",
      "date_basis": "1 Year (One Year)",
      "date_is_approximate": false,
      "statement": "Infrastructure Limited has received the Letter of Acceptance (LOA) of Rs. 91,77,77,777/- (Rupees Ninety-One Crore Seventy-Seven Lakh Seventy-Seven Thousand Seven Hundred",
      "value_text": "Rs. 91,77,77,777/-",
      "counterparty": "National Highways Authority of India (NHAI)",
      "source_filing": "https://nsearchives.nseindia.com/corporate/HIGHWAY123_26102026201934_HIL_Reg30_Baiti_Kala_26102026.pdf",
      "company_page": "https://withriver.in/won/HILINFRA"
    },
    {
      "symbol": "TEXRAIL",
      "company_name": "Texmaco Rail & Engineering Limited",
      "kind": "order",
      "said_on": "2026-04-29",
      "due_on": "2027-10-29",
      "date_basis": "Within 18 months from the date of issue of",
      "date_is_approximate": true,
      "statement": "Provision of interlocking arrangement at. Awarded by Southern Railway",
      "value_text": "Rs. 187.28 crores",
      "counterparty": null,
      "source_filing": "https://nsearchives.nseindia.com/corporate/TEXRAIL_29042026221944_TexRailOrderWin29042026.pdf",
      "company_page": "https://withriver.in/won/TEXRAIL"
    },
    {
      "symbol": "OMPOWER",
      "company_name": "Om Power Transmission Limited",
      "kind": "order",
      "said_on": "2026-04-30",
      "due_on": "2027-10-30",
      "date_basis": "18 months from the date of LOA",
      "date_is_approximate": true,
      "statement": "Supply, erection, testing, and commissioning of 220kV & 66kV equipment & materials on turnkey basis including civil works for 220kV Jantral AIS Substation. Awarded by Gujarat Energy Transmission Corporation Limited",
      "value_text": "Rs. 44.95 Crores",
      "counterparty": "Gujarat Energy Transmission Corporation Limited",
      "source_filing": "https://nsearchives.nseindia.com/corporate/OMPOWER_30042026201945_V0_Intimation_receipt_of_order.pdf",
      "company_page": "https://withriver.in/won/OMPOWER"
    },
    {
      "symbol": "EMSLIMITED",
      "company_name": "EMS Limited",
      "kind": "order",
      "said_on": "2026-07-31",
      "due_on": "2027-10-31",
      "date_basis": "15 months",
      "date_is_approximate": false,
      "statement": "The Estimated order value (inclusive GST) is approximately Rs. 15,828.57 (Rupees Fifteen Thousand Eight Hundred and Twenty-Eight Lakhs only).",
      "value_text": "15,828.57 lakhs",
      "counterparty": "Delhi Jal Board",
      "source_filing": "https://nsearchives.nseindia.com/corporate/EMSLIMITED_31072026103631_Intimation_LOA_Delhi_Jal_Board.pdf",
      "company_page": "https://withriver.in/won/EMSLIMITED"
    }
  ],
  "other_months": [
    {
      "period": "2028-10",
      "commitments": 9,
      "url": "https://withriver.in/clock/2028-10",
      "data": "https://withriver.in/clock/2028-10/data.json"
    },
    {
      "period": "2028-09",
      "commitments": 14,
      "url": "https://withriver.in/clock/2028-09",
      "data": "https://withriver.in/clock/2028-09/data.json"
    },
    {
      "period": "2028-08",
      "commitments": 15,
      "url": "https://withriver.in/clock/2028-08",
      "data": "https://withriver.in/clock/2028-08/data.json"
    },
    {
      "period": "2028-07",
      "commitments": 8,
      "url": "https://withriver.in/clock/2028-07",
      "data": "https://withriver.in/clock/2028-07/data.json"
    },
    {
      "period": "2028-06",
      "commitments": 8,
      "url": "https://withriver.in/clock/2028-06",
      "data": "https://withriver.in/clock/2028-06/data.json"
    },
    {
      "period": "2028-05",
      "commitments": 17,
      "url": "https://withriver.in/clock/2028-05",
      "data": "https://withriver.in/clock/2028-05/data.json"
    },
    {
      "period": "2028-04",
      "commitments": 20,
      "url": "https://withriver.in/clock/2028-04",
      "data": "https://withriver.in/clock/2028-04/data.json"
    },
    {
      "period": "2028-03",
      "commitments": 45,
      "url": "https://withriver.in/clock/2028-03",
      "data": "https://withriver.in/clock/2028-03/data.json"
    },
    {
      "period": "2028-02",
      "commitments": 13,
      "url": "https://withriver.in/clock/2028-02",
      "data": "https://withriver.in/clock/2028-02/data.json"
    },
    {
      "period": "2028-01",
      "commitments": 7,
      "url": "https://withriver.in/clock/2028-01",
      "data": "https://withriver.in/clock/2028-01/data.json"
    },
    {
      "period": "2027-12",
      "commitments": 12,
      "url": "https://withriver.in/clock/2027-12",
      "data": "https://withriver.in/clock/2027-12/data.json"
    },
    {
      "period": "2027-11",
      "commitments": 13,
      "url": "https://withriver.in/clock/2027-11",
      "data": "https://withriver.in/clock/2027-11/data.json"
    },
    {
      "period": "2027-10",
      "commitments": 17,
      "url": "https://withriver.in/clock/2027-10",
      "data": "https://withriver.in/clock/2027-10/data.json"
    },
    {
      "period": "2027-09",
      "commitments": 35,
      "url": "https://withriver.in/clock/2027-09",
      "data": "https://withriver.in/clock/2027-09/data.json"
    },
    {
      "period": "2027-08",
      "commitments": 27,
      "url": "https://withriver.in/clock/2027-08",
      "data": "https://withriver.in/clock/2027-08/data.json"
    },
    {
      "period": "2027-07",
      "commitments": 23,
      "url": "https://withriver.in/clock/2027-07",
      "data": "https://withriver.in/clock/2027-07/data.json"
    },
    {
      "period": "2027-06",
      "commitments": 28,
      "url": "https://withriver.in/clock/2027-06",
      "data": "https://withriver.in/clock/2027-06/data.json"
    },
    {
      "period": "2027-05",
      "commitments": 19,
      "url": "https://withriver.in/clock/2027-05",
      "data": "https://withriver.in/clock/2027-05/data.json"
    },
    {
      "period": "2027-04",
      "commitments": 20,
      "url": "https://withriver.in/clock/2027-04",
      "data": "https://withriver.in/clock/2027-04/data.json"
    },
    {
      "period": "2027-03",
      "commitments": 271,
      "url": "https://withriver.in/clock/2027-03",
      "data": "https://withriver.in/clock/2027-03/data.json"
    },
    {
      "period": "2027-02",
      "commitments": 15,
      "url": "https://withriver.in/clock/2027-02",
      "data": "https://withriver.in/clock/2027-02/data.json"
    },
    {
      "period": "2027-01",
      "commitments": 28,
      "url": "https://withriver.in/clock/2027-01",
      "data": "https://withriver.in/clock/2027-01/data.json"
    },
    {
      "period": "2026-12",
      "commitments": 54,
      "url": "https://withriver.in/clock/2026-12",
      "data": "https://withriver.in/clock/2026-12/data.json"
    },
    {
      "period": "2026-11",
      "commitments": 33,
      "url": "https://withriver.in/clock/2026-11",
      "data": "https://withriver.in/clock/2026-11/data.json"
    },
    {
      "period": "2026-10",
      "commitments": 28,
      "url": "https://withriver.in/clock/2026-10",
      "data": "https://withriver.in/clock/2026-10/data.json"
    },
    {
      "period": "2026-09",
      "commitments": 60,
      "url": "https://withriver.in/clock/2026-09",
      "data": "https://withriver.in/clock/2026-09/data.json"
    },
    {
      "period": "2026-08",
      "commitments": 28,
      "url": "https://withriver.in/clock/2026-08",
      "data": "https://withriver.in/clock/2026-08/data.json"
    },
    {
      "period": "2026-07",
      "commitments": 10,
      "url": "https://withriver.in/clock/2026-07",
      "data": "https://withriver.in/clock/2026-07/data.json"
    },
    {
      "period": "2026-06",
      "commitments": 18,
      "url": "https://withriver.in/clock/2026-06",
      "data": "https://withriver.in/clock/2026-06/data.json"
    },
    {
      "period": "2026-05",
      "commitments": 11,
      "url": "https://withriver.in/clock/2026-05",
      "data": "https://withriver.in/clock/2026-05/data.json"
    },
    {
      "period": "2026-04",
      "commitments": 2,
      "url": "https://withriver.in/clock/2026-04",
      "data": "https://withriver.in/clock/2026-04/data.json"
    },
    {
      "period": "2026-03",
      "commitments": 6,
      "url": "https://withriver.in/clock/2026-03",
      "data": "https://withriver.in/clock/2026-03/data.json"
    }
  ]
}