  "source_name": "River",
  "canonical": "https://withriver.in/clock/2027-06",
  "description": "28 dated commitments from 18 NSE-listed companies falling due in June 2027, each with the company's own words and the filing it came from.",
  "method": "Every row is a date an Indian listed company stated in a filing with the NSE, resolved to a calendar day from the company's own words. The phrase the date was read out of is given as date_basis so the resolution can be checked. date_is_approximate is true where the company counted from a date it did not state -- 'within 18 months of the appointed date' -- in which case River counted from the filing date and marks it rather than presenting an estimate as a stated date. Nothing here says whether the commitment was met: a listed company must disclose winning an order, and amending or terminating one, but is not required to disclose completing one.",
  "license": "Free to quote and reproduce with attribution to River (withriver.in). Underlying documents are public filings of the National Stock Exchange of India.",
  "attribution": "River — withriver.in",
  "generated_at": "2026-10-28T15:06:58.100Z",
  "period": "2027-06",
  "period_label": "June 2027",
  "period_has_ended": false,
  "totals": {
    "commitments": 28,
    "companies": 18,
    "order_delivery_windows": 26,
    "management_statements": 2,
    "dates_resolved_from_an_assumed_anchor": 3,
    "value_inr_crore": 3156.86,
    "commitments_with_a_stated_value": 21
  },
  "commitments": [
    {
      "symbol": "SBC",
      "company_name": "SBC Exports Limited",
      "kind": "order",
      "said_on": "2026-06-02",
      "due_on": "2027-06-02",
      "date_basis": "1(One) year from the date of Purchase Order i.e. 02.06.2026",
      "date_is_approximate": false,
      "statement": "Limited has received a repeat Export Order for supply of various Garment articles including TShirts, Trousers, and Shorts etc. for a value of ₹ 18 Crore (Rupees Eighteen Crore only ) from a Dubai based Textile Company.",
      "value_text": "₹ 18 Crore",
      "counterparty": "HUXXE Readymade Garments",
      "source_filing": "https://nsearchives.nseindia.com/corporate/SBC_02062026142441_Huxx.pdf",
      "company_page": "https://withriver.in/won/SBC"
    },
    {
      "symbol": "MARSONS",
      "company_name": "Marsons Limited",
      "kind": "order",
      "said_on": "2026-06-03",
      "due_on": "2027-06-03",
      "date_basis": "12 months",
      "date_is_approximate": false,
      "statement": "GST) (Thirty One Crore Twenty Six Lakhs Seventy Thousand and Five Hundred only) from Assam Electricity Grid Corporation Limited for Supply of 132/33kV, 50MVA Power Transformers and Related Services for Durlavcherra, Karimganj& Srikona Substations of AEGCL (Package-T-3).",
      "value_text": "₹31,26,70,500.00",
      "counterparty": "Assam Electricity Grid Corporation Limited",
      "source_filing": "https://nsearchives.nseindia.com/corporate/MARSONS_03062026134601_disclosure.pdf",
      "company_page": "https://withriver.in/won/MARSONS"
    },
    {
      "symbol": "INNOVISION",
      "company_name": "Innovision Limited",
      "kind": "order",
      "said_on": "2026-06-04",
      "due_on": "2027-06-04",
      "date_basis": "1 year from 11.07.2026",
      "date_is_approximate": false,
      "statement": "Engagement of user fee agency on the basis Competitive Bidding for Mundiyar Fee Plaza at Km 1217.725 from Baran Shivpuri Section from Km 1184.322 to 1251.",
      "value_text": null,
      "counterparty": "NHAI (National Highways Authority of India)",
      "source_filing": "https://nsearchives.nseindia.com/corporate/INNOVISION2007_04062026154339_Work_Order_Intimation_040626_LH_Signed.pdf",
      "company_page": "https://withriver.in/won/INNOVISION"
    },
    {
      "symbol": "INNOVISION",
      "company_name": "Innovision Limited",
      "kind": "order",
      "said_on": "2026-06-06",
      "due_on": "2027-06-06",
      "date_basis": "1 year",
      "date_is_approximate": false,
      "statement": "The award was granted under tender ID NHAI/13013/547/CO/26-27/CB/Belon FP/E-3959/R-1515.",
      "value_text": null,
      "counterparty": "NHAI (National Highways Authority of India)",
      "source_filing": "https://nsearchives.nseindia.com/corporate/INNOVISION2007_06062026131656_Work_Order_Intimation_060626_LH_signed.pdf",
      "company_page": "https://withriver.in/won/INNOVISION"
    },
    {
      "symbol": "BCPL",
      "company_name": "BCPL Railway Infrastructure Limited",
      "kind": "order",
      "said_on": "2026-06-10",
      "due_on": "2027-06-10",
      "date_basis": "within 12 months",
      "date_is_approximate": false,
      "statement": "BCPL Railway Infra bags Rs. 130.95 million work under",
      "value_text": "Rs. 130.95 million",
      "counterparty": null,
      "source_filing": "https://nsearchives.nseindia.com/corporate/BCPL_10062026153257_press_release_SE10-6-26.pdf",
      "company_page": "https://withriver.in/won/BCPL"
    },
    {
      "symbol": "BCPL",
      "company_name": "BCPL Railway Infrastructure Limited",
      "kind": "order",
      "said_on": "2026-06-11",
      "due_on": "2027-06-11",
      "date_basis": "within 12 months",
      "date_is_approximate": false,
      "statement": "BCPL Railway Infra bags Rs. 28.92 million work under",
      "value_text": "Rs. 28.92 million",
      "counterparty": null,
      "source_filing": "https://nsearchives.nseindia.com/corporate/BCPL_11062026192153_press_release_SE11-06-2026.pdf",
      "company_page": "https://withriver.in/won/BCPL"
    },
    {
      "symbol": "ARSSINFRA",
      "company_name": "ARSS Infrastructure Projects Limited",
      "kind": "order",
      "said_on": "2026-10-12",
      "due_on": "2027-06-12",
      "date_basis": "8 Months",
      "date_is_approximate": false,
      "statement": "Broad commercial consideration or size of Rs. 22,66,55,719 (Rupees Twenty Two Crore e",
      "value_text": "Rs. 22,66,55,719",
      "counterparty": "ARSS Infrastructure Projects Limited",
      "source_filing": "https://nsearchives.nseindia.com/corporate/ARSSINFRA_12102026184613_work_order_12102026.pdf",
      "company_page": "https://withriver.in/won/ARSSINFRA"
    },
    {
      "symbol": "EIEL",
      "company_name": "Enviro Infra Engineers Limited",
      "kind": "order",
      "said_on": "2026-03-12",
      "due_on": "2027-06-12",
      "date_basis": "within 15 months",
      "date_is_approximate": false,
      "statement": "Aurangabad Sewerage Network and STP Scheme under AMRUT 2.0 including (I) EPC of 20 MLD",
      "value_text": "₹ 411.08 Crores",
      "counterparty": "Bihar Urban Infrastructure Development Corporation Limited",
      "source_filing": "https://nsearchives.nseindia.com/corporate/ENVIRO_12032026090020_Reg_30_411_Cr.pdf",
      "company_page": "https://withriver.in/won/EIEL"
    },
    {
      "symbol": "RAILTEL",
      "company_name": "Railtel Corporation Of India Limited",
      "kind": "order",
      "said_on": "2026-06-15",
      "due_on": "2027-06-14",
      "date_basis": "14-JUN-27",
      "date_is_approximate": false,
      "statement": "WorkOrder. Awarded by MunitionsIndiaLimited",
      "value_text": null,
      "counterparty": "Munitions India Limited",
      "source_filing": "https://nsearchives.nseindia.com/corporate/RAILTEL_15062026184120_Order_Book_Company_Report_24532.pdf",
      "company_page": "https://withriver.in/won/RAILTEL"
    },
    {
      "symbol": "CEWATER",
      "company_name": "Concord Enviro Systems Limited",
      "kind": "order",
      "said_on": "2026-06-15",
      "due_on": "2027-06-15",
      "date_basis": "12 months",
      "date_is_approximate": false,
      "statement": "Requirements) Regulations, 2015 – Receipt of Orders.",
      "value_text": "INR 16 crores",
      "counterparty": "Major Steel Manufacturer",
      "source_filing": "https://nsearchives.nseindia.com/corporate/CONCORDENVIRO_15062026183914_PressReleaseConcordEnviro15thJune2026.pdf",
      "company_page": "https://withriver.in/won/CEWATER"
    },
    {
      "symbol": "INTERARCH",
      "company_name": "Interarch Building Solutions Limited",
      "kind": "order",
      "said_on": "2026-08-18",
      "due_on": "2027-06-18",
      "date_basis": "Approx. 10 months",
      "date_is_approximate": false,
      "statement": "Bagging/Receiving of Orders/Contracts",
      "value_text": "Rs.128 Crores",
      "counterparty": "Due to commercial issue, the Company cannot disclose the name of the Customer",
      "source_filing": "https://nsearchives.nseindia.com/corporate/INTERARCH1983_18082026173856_Bagging_Orders_under_Reg_30.pdf",
      "company_page": "https://withriver.in/won/INTERARCH"
    },
    {
      "symbol": "BCPL",
      "company_name": "BCPL Railway Infrastructure Limited",
      "kind": "order",
      "said_on": "2026-06-19",
      "due_on": "2027-06-19",
      "date_basis": "within 12 months",
      "date_is_approximate": false,
      "statement": "BCPL Railway Infra bags Rs. 46.18 million work under",
      "value_text": "Rs. 46.18 million",
      "counterparty": null,
      "source_filing": "https://nsearchives.nseindia.com/corporate/BCPL_19062026154504_press_release_SE19-06-2026.pdf",
      "company_page": "https://withriver.in/won/BCPL"
    },
    {
      "symbol": "TEXRAIL",
      "company_name": "Texmaco Rail & Engineering Limited",
      "kind": "order",
      "said_on": "2026-06-20",
      "due_on": "2027-06-20",
      "date_basis": "Within 12 months from the date of Letter(s) of Award",
      "date_is_approximate": false,
      "statement": "Nature of order(s) / contract(s) Engineering, Supply Installation, Testing. Awarded by Odisha Power Transmission Corporation",
      "value_text": "Rs. 11.65 crores",
      "counterparty": "Odisha Power Transmission Corporation",
      "source_filing": "https://nsearchives.nseindia.com/corporate/TEXRAIL_20062026222514_TexRailSEIntimation20062026.pdf",
      "company_page": "https://withriver.in/won/TEXRAIL"
    },
    {
      "symbol": "DENTA",
      "company_name": "Denta Water and Infra Solutions Limited",
      "kind": "order",
      "said_on": "2026-07-21",
      "due_on": "2027-06-21",
      "date_basis": "11 months",
      "date_is_approximate": false,
      "statement": "(i)Intimation of receipt of letter of Acceptance (LOA) from KNNL amounting to Rs. 20,88,92,101 (ii)New order received by Company as a Subcontract amounting to Rs. 44,67,43,341.",
      "value_text": "Rs. 20,88,92,101",
      "counterparty": "KNNL",
      "source_filing": "https://nsearchives.nseindia.com/corporate/DENTA_21072026110146_General_Update_July_21_2026.pdf",
      "company_page": "https://withriver.in/won/DENTA"
    },
    {
      "symbol": "INNOVISION",
      "company_name": "Innovision Limited",
      "kind": "order",
      "said_on": "2026-06-24",
      "due_on": "2027-06-24",
      "date_basis": "1 year from 15.08.2026 after 8:00 AM onwards",
      "date_is_approximate": false,
      "statement": "Engagement of user fee agency on the basis of Competitive Bidding for Pileru to Puthalapattu Section (Two",
      "value_text": null,
      "counterparty": "NHAI (National Highways Authority of India)",
      "source_filing": "https://nsearchives.nseindia.com/corporate/INNOVISION2007_24062026184711_Work_Order_Intimation_230626_LH_Signed.pdf",
      "company_page": "https://withriver.in/won/INNOVISION"
    },
    {
      "symbol": "TEXRAIL",
      "company_name": "Texmaco Rail & Engineering Limited",
      "kind": "order",
      "said_on": "2026-06-24",
      "due_on": "2027-06-24",
      "date_basis": "Within 12 months from the date of issue of Letter of Acceptance",
      "date_is_approximate": true,
      "statement": "Nature of order(s) / contract(s) Provision of Nylon Net, Anti monkey Climbing Device and anti-bird disc over. Awarded by Western Railway",
      "value_text": "Rs. 6.28 crores",
      "counterparty": null,
      "source_filing": "https://nsearchives.nseindia.com/corporate/TEXRAIL_24062026180215_ORDERWESTERNRAILWAY24062026SIGNED.pdf",
      "company_page": "https://withriver.in/won/TEXRAIL"
    },
    {
      "symbol": "INNOVISION",
      "company_name": "Innovision Limited",
      "kind": "order",
      "said_on": "2026-06-25",
      "due_on": "2027-06-25",
      "date_basis": "1 year from 19.08.2026",
      "date_is_approximate": false,
      "statement": "Engagement of user fee agency on the basis of Competitive Bidding through e-Tender Sirohi Bahali Fee Plaza at km.",
      "value_text": null,
      "counterparty": "NHAI (National Highways Authority of India)",
      "source_filing": "https://nsearchives.nseindia.com/corporate/INNOVISION2007_25062026183008_Work_Order_Sirohi_LH_signed.pdf",
      "company_page": "https://withriver.in/won/INNOVISION"
    },
    {
      "symbol": "REFEX",
      "company_name": "Refex Industries Limited",
      "kind": "order",
      "said_on": "2026-06-26",
      "due_on": "2027-06-26",
      "date_basis": "12 Months",
      "date_is_approximate": false,
      "statement": "Transportation of ash to construction site of road projects of NHAI and other Central or State Government Road construction department / Authority / PMGSY Road. Awarded by Major Power Producer (A Maharatna CPSE)",
      "value_text": "INR 21.15 Crore",
      "counterparty": "Major Power Producer (A Maharatna CPSE)",
      "source_filing": "https://nsearchives.nseindia.com/corporate/REFEX2002_26062026105304_RIL_BOD_26062026_sd.pdf",
      "company_page": "https://withriver.in/won/REFEX"
    },
    {
      "symbol": "TEXRAIL",
      "company_name": "Texmaco Rail & Engineering Limited",
      "kind": "order",
      "said_on": "2026-06-27",
      "due_on": "2027-06-27",
      "date_basis": "Within 12 months from the effective /",
      "date_is_approximate": false,
      "statement": "Design, Supply, Erection, Testing &. Awarded by Mangalore Coal Terminal Private Limited",
      "value_text": "Rs. 4.71 crores",
      "counterparty": "Mangalore Coal Terminal Private Limited",
      "source_filing": "https://nsearchives.nseindia.com/corporate/TEXRAIL_27062026170527_TEXRAILSESIGNED.pdf",
      "company_page": "https://withriver.in/won/TEXRAIL"
    },
    {
      "symbol": "GRINFRA",
      "company_name": "G R Infraprojects Limited",
      "kind": "order",
      "said_on": "2026-03-29",
      "due_on": "2027-06-29",
      "date_basis": "15 Months from the Appointed Date",
      "date_is_approximate": true,
      "statement": "Super Thermal Power Station including services, Ex-Works (India) Supply and Comprehensive",
      "value_text": "Rs. 413.37 Crores",
      "counterparty": "NTPC Limited",
      "source_filing": "https://nsearchives.nseindia.com/corporate/GRINFRA_29032026162247_LOA_Intimation_SE.pdf",
      "company_page": "https://withriver.in/won/GRINFRA"
    },
    {
      "symbol": "SOLARWORLD",
      "company_name": "Solarworld Energy Solutions Limited",
      "kind": "order",
      "said_on": "2026-03-29",
      "due_on": "2027-06-29",
      "date_basis": "Completion of facilities – 15 Months",
      "date_is_approximate": false,
      "statement": "Requirements) Regulations, 2015 – Letter of Award of Contract for Ex-Works (India)",
      "value_text": "INR 314.26 Cr",
      "counterparty": "NTPC Limited (Formerly National Thermal Power Corporation Limited)",
      "source_filing": "https://nsearchives.nseindia.com/corporate/SUNSHINE123_29032026193029_Intimation_of_Letter__of_Award_NTPC.pdf",
      "company_page": "https://withriver.in/won/SOLARWORLD"
    },
    {
      "symbol": "EIEL",
      "company_name": "Enviro Infra Engineers Limited",
      "kind": "order",
      "said_on": "2026-05-27",
      "due_on": "2027-06-30",
      "date_basis": "By 30th June, 2027",
      "date_is_approximate": false,
      "statement": "The Company has received the intimation from SUL on 27th May, 2026 at 01:49 P.M.",
      "value_text": "₹ 207.47 Crore",
      "counterparty": "CGE 30 HYBRID ENERGY PRIVATE LIMITED",
      "source_filing": "https://nsearchives.nseindia.com/corporate/ENVIRO_27052026190640_Intimation_Reg_30_Suyog.pdf",
      "company_page": "https://withriver.in/won/EIEL"
    },
    {
      "symbol": "EIEL",
      "company_name": "Enviro Infra Engineers Limited",
      "kind": "order",
      "said_on": "2026-03-30",
      "due_on": "2027-06-30",
      "date_basis": "within 15 months",
      "date_is_approximate": false,
      "statement": "EPC Package for supply, services and Annual Maintenance for BESS Implementation at Tanda Super Thermal Power Station and Bongaigaon Thermal Power Station. Awarded by NTPC Limited",
      "value_text": "₹ 405.71 Crores",
      "counterparty": "NTPC Limited",
      "source_filing": "https://nsearchives.nseindia.com/corporate/ENVIRO_30032026125652_Reg_30_NTPC_Intimation.pdf",
      "company_page": "https://withriver.in/won/EIEL"
    },
    {
      "symbol": "PACEDIGITK",
      "company_name": "Pace Digitek Limited",
      "kind": "order",
      "said_on": "2026-03-30",
      "due_on": "2027-06-30",
      "date_basis": "within 15 Months",
      "date_is_approximate": false,
      "statement": "Pace Digitek Limited (Formerly Known as Pace Digitek Private Limited and Pace Digitek Infra Private Limited)",
      "value_text": "Rs. 4,945.4 Million",
      "counterparty": "NTPC Limited",
      "source_filing": "https://nsearchives.nseindia.com/corporate/PACE_30032026183157_NTPC_Order_Intimation_.pdf",
      "company_page": "https://withriver.in/won/PACEDIGITK"
    },
    {
      "symbol": "SOLARWORLD",
      "company_name": "Solarworld Energy Solutions Limited",
      "kind": "order",
      "said_on": "2026-03-30",
      "due_on": "2027-06-30",
      "date_basis": "Completion of facilities – 15 Months",
      "date_is_approximate": false,
      "statement": "4 Order Value Approximately INR 108.22 Cr.",
      "value_text": "INR 108.22 Cr",
      "counterparty": "NTPC Limited (Formerly National Thermal Power Corporation Limited)",
      "source_filing": "https://nsearchives.nseindia.com/corporate/SUNSHINE123_30032026150824_Intimation_of_LOA_Uncahar.pdf",
      "company_page": "https://withriver.in/won/SOLARWORLD"
    },
    {
      "symbol": "SRM",
      "company_name": "SRM Contractors Limited",
      "kind": "order",
      "said_on": "2026-06-30",
      "due_on": "2027-06-30",
      "date_basis": "12 Months from the appointed date",
      "date_is_approximate": true,
      "statement": "56.328 - 56.432 km on NH-107 & 81.240 to 81.550 km) on NH-107A in the state of Uttarakhand under Annual Plan",
      "value_text": "Rs. 5,00,99,20,213.10",
      "counterparty": "MSIDC (Maharashtra State Infrastructure Corporation Limited)",
      "source_filing": "https://nsearchives.nseindia.com/corporate/SRMCONTRACT_30062026110411_Intimation_for_bagging_of_contracts.pdf",
      "company_page": "https://withriver.in/won/SRM"
    },
    {
      "symbol": "VINCOFE",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-08-10",
      "due_on": "2027-06-30",
      "date_basis": "by June 2027",
      "date_is_approximate": false,
      "statement": "we are planning to be ready by the middle of next year. By June, we should be able to complete the trials and then start from the second quarter onwards.",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/VINCOFE"
    },
    {
      "symbol": "YATHARTH",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-08-18",
      "due_on": "2027-06-30",
      "date_basis": "Q1 FY28",
      "date_is_approximate": false,
      "statement": "we expect the hospital to go live by quarter 1 of the next fiscal with a potential to achieve an ARPOB of INR50,000 plus",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/YATHARTH"
    }
  ],
  "other_months": [
    {
      "period": "2028-10",
      "commitments": 9,
      "url": "https://withriver.in/clock/2028-10",
      "data": "https://withriver.in/clock/2028-10/data.json"
    },
    {
      "period": "2028-09",
      "commitments": 14,
      "url": "https://withriver.in/clock/2028-09",
      "data": "https://withriver.in/clock/2028-09/data.json"
    },
    {
      "period": "2028-08",
      "commitments": 15,
      "url": "https://withriver.in/clock/2028-08",
      "data": "https://withriver.in/clock/2028-08/data.json"
    },
    {
      "period": "2028-07",
      "commitments": 8,
      "url": "https://withriver.in/clock/2028-07",
      "data": "https://withriver.in/clock/2028-07/data.json"
    },
    {
      "period": "2028-06",
      "commitments": 8,
      "url": "https://withriver.in/clock/2028-06",
      "data": "https://withriver.in/clock/2028-06/data.json"
    },
    {
      "period": "2028-05",
      "commitments": 17,
      "url": "https://withriver.in/clock/2028-05",
      "data": "https://withriver.in/clock/2028-05/data.json"
    },
    {
      "period": "2028-04",
      "commitments": 20,
      "url": "https://withriver.in/clock/2028-04",
      "data": "https://withriver.in/clock/2028-04/data.json"
    },
    {
      "period": "2028-03",
      "commitments": 45,
      "url": "https://withriver.in/clock/2028-03",
      "data": "https://withriver.in/clock/2028-03/data.json"
    },
    {
      "period": "2028-02",
      "commitments": 13,
      "url": "https://withriver.in/clock/2028-02",
      "data": "https://withriver.in/clock/2028-02/data.json"
    },
    {
      "period": "2028-01",
      "commitments": 7,
      "url": "https://withriver.in/clock/2028-01",
      "data": "https://withriver.in/clock/2028-01/data.json"
    },
    {
      "period": "2027-12",
      "commitments": 12,
      "url": "https://withriver.in/clock/2027-12",
      "data": "https://withriver.in/clock/2027-12/data.json"
    },
    {
      "period": "2027-11",
      "commitments": 13,
      "url": "https://withriver.in/clock/2027-11",
      "data": "https://withriver.in/clock/2027-11/data.json"
    },
    {
      "period": "2027-10",
      "commitments": 17,
      "url": "https://withriver.in/clock/2027-10",
      "data": "https://withriver.in/clock/2027-10/data.json"
    },
    {
      "period": "2027-09",
      "commitments": 35,
      "url": "https://withriver.in/clock/2027-09",
      "data": "https://withriver.in/clock/2027-09/data.json"
    },
    {
      "period": "2027-08",
      "commitments": 27,
      "url": "https://withriver.in/clock/2027-08",
      "data": "https://withriver.in/clock/2027-08/data.json"
    },
    {
      "period": "2027-07",
      "commitments": 23,
      "url": "https://withriver.in/clock/2027-07",
      "data": "https://withriver.in/clock/2027-07/data.json"
    },
    {
      "period": "2027-06",
      "commitments": 28,
      "url": "https://withriver.in/clock/2027-06",
      "data": "https://withriver.in/clock/2027-06/data.json"
    },
    {
      "period": "2027-05",
      "commitments": 19,
      "url": "https://withriver.in/clock/2027-05",
      "data": "https://withriver.in/clock/2027-05/data.json"
    },
    {
      "period": "2027-04",
      "commitments": 20,
      "url": "https://withriver.in/clock/2027-04",
      "data": "https://withriver.in/clock/2027-04/data.json"
    },
    {
      "period": "2027-03",
      "commitments": 271,
      "url": "https://withriver.in/clock/2027-03",
      "data": "https://withriver.in/clock/2027-03/data.json"
    },
    {
      "period": "2027-02",
      "commitments": 15,
      "url": "https://withriver.in/clock/2027-02",
      "data": "https://withriver.in/clock/2027-02/data.json"
    },
    {
      "period": "2027-01",
      "commitments": 28,
      "url": "https://withriver.in/clock/2027-01",
      "data": "https://withriver.in/clock/2027-01/data.json"
    },
    {
      "period": "2026-12",
      "commitments": 54,
      "url": "https://withriver.in/clock/2026-12",
      "data": "https://withriver.in/clock/2026-12/data.json"
    },
    {
      "period": "2026-11",
      "commitments": 33,
      "url": "https://withriver.in/clock/2026-11",
      "data": "https://withriver.in/clock/2026-11/data.json"
    },
    {
      "period": "2026-10",
      "commitments": 28,
      "url": "https://withriver.in/clock/2026-10",
      "data": "https://withriver.in/clock/2026-10/data.json"
    },
    {
      "period": "2026-09",
      "commitments": 60,
      "url": "https://withriver.in/clock/2026-09",
      "data": "https://withriver.in/clock/2026-09/data.json"
    },
    {
      "period": "2026-08",
      "commitments": 28,
      "url": "https://withriver.in/clock/2026-08",
      "data": "https://withriver.in/clock/2026-08/data.json"
    },
    {
      "period": "2026-07",
      "commitments": 10,
      "url": "https://withriver.in/clock/2026-07",
      "data": "https://withriver.in/clock/2026-07/data.json"
    },
    {
      "period": "2026-06",
      "commitments": 18,
      "url": "https://withriver.in/clock/2026-06",
      "data": "https://withriver.in/clock/2026-06/data.json"
    },
    {
      "period": "2026-05",
      "commitments": 11,
      "url": "https://withriver.in/clock/2026-05",
      "data": "https://withriver.in/clock/2026-05/data.json"
    },
    {
      "period": "2026-04",
      "commitments": 2,
      "url": "https://withriver.in/clock/2026-04",
      "data": "https://withriver.in/clock/2026-04/data.json"
    },
    {
      "period": "2026-03",
      "commitments": 6,
      "url": "https://withriver.in/clock/2026-03",
      "data": "https://withriver.in/clock/2026-03/data.json"
    }
  ]
}