  "source_name": "River",
  "canonical": "https://withriver.in/clock/2027-04",
  "description": "20 dated commitments from 16 NSE-listed companies falling due in April 2027, each with the company's own words and the filing it came from.",
  "method": "Every row is a date an Indian listed company stated in a filing with the NSE, resolved to a calendar day from the company's own words. The phrase the date was read out of is given as date_basis so the resolution can be checked. date_is_approximate is true where the company counted from a date it did not state -- 'within 18 months of the appointed date' -- in which case River counted from the filing date and marks it rather than presenting an estimate as a stated date. Nothing here says whether the commitment was met: a listed company must disclose winning an order, and amending or terminating one, but is not required to disclose completing one.",
  "license": "Free to quote and reproduce with attribution to River (withriver.in). Underlying documents are public filings of the National Stock Exchange of India.",
  "attribution": "River — withriver.in",
  "generated_at": "2026-10-28T15:08:23.433Z",
  "period": "2027-04",
  "period_label": "April 2027",
  "period_has_ended": false,
  "totals": {
    "commitments": 20,
    "companies": 16,
    "order_delivery_windows": 17,
    "management_statements": 3,
    "dates_resolved_from_an_assumed_anchor": 3,
    "value_inr_crore": 1890.17,
    "commitments_with_a_stated_value": 13
  },
  "commitments": [
    {
      "symbol": "CENTUM",
      "company_name": "Centum Electronics Limited",
      "kind": "order",
      "said_on": "2026-09-01",
      "due_on": "2027-04-01",
      "date_basis": "As per the terms and conditions of the order. Over the next 7 months",
      "date_is_approximate": false,
      "statement": "This order marks a significant milestone for the Company and represents a major strategic win for the Centum’s Build to Specification (BTS) export business.",
      "value_text": "₹ 305 Million",
      "counterparty": null,
      "source_filing": "https://nsearchives.nseindia.com/corporate/CENTUME_01092026213338_Intimation.pdf",
      "company_page": "https://withriver.in/won/CENTUM"
    },
    {
      "symbol": "MCLOUD",
      "company_name": "Magellanic Cloud Limited",
      "kind": "order",
      "said_on": "2026-04-01",
      "due_on": "2027-04-01",
      "date_basis": "365 Days from commencement of work (as per LOA terms)",
      "date_is_approximate": true,
      "statement": "The total contract value is approximately INR 7.88 Crore and the project is required to be executed within a period of 365 days, in accordance with Indian Railways General Conditions of Contract and tender conditions.",
      "value_text": "INR 7.88 Crore",
      "counterparty": "South Central Railway, Vijayawada Division (Indian Railways)",
      "source_filing": "https://nsearchives.nseindia.com/corporate/MCLOUD_01042026140116_PROVIGIL_South_Central_sign_.pdf",
      "company_page": "https://withriver.in/won/MCLOUD"
    },
    {
      "symbol": "CEIGALL",
      "company_name": "Ceigall India Limited",
      "kind": "order",
      "said_on": "2026-04-02",
      "due_on": "2027-04-02",
      "date_basis": "• 12 Months of Work Execution • 25 Years of Operational Period",
      "date_is_approximate": false,
      "statement": "The project carries an estimated EPC cost of ₹572 crore (including GST) and includes a 12-month execution period, followed by a 25-year operational term.",
      "value_text": "₹572 crore",
      "counterparty": "Madhya Pradesh Power Management Company Limited (MPPMCL)",
      "source_filing": "https://nsearchives.nseindia.com/corporate/ceigall_02042026130203_Intimation_Power_Purchase_Agreement_02042026.pdf",
      "company_page": "https://withriver.in/won/CEIGALL"
    },
    {
      "symbol": "EPACKPEB",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-08-02",
      "due_on": "2027-04-02",
      "date_basis": "next 8 months",
      "date_is_approximate": false,
      "statement": "INR 13,764 Mn Prefab order book pending showing a clear visibility over next 8 Months",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/EPACKPEB"
    },
    {
      "symbol": "SRM",
      "company_name": "SRM Contractors Limited",
      "kind": "order",
      "said_on": "2026-04-04",
      "due_on": "2027-04-04",
      "date_basis": "12 Months from the appointed date",
      "date_is_approximate": true,
      "statement": "Package 6 - Construction of Nashik Ring Road (Southern side) from Design chainage 14.950 to 28.970 (Length 14.020km) under EPC mode. Awarded by MSIDC (Maharashtra State Infrastructure Development Corporation Limited)",
      "value_text": "Rs. 483 Crores",
      "counterparty": "MSIDC (Maharashtra State Infrastructure Development Corporation Limited)",
      "source_filing": "https://nsearchives.nseindia.com/corporate/SRMCONTRACT_04042026125508_order_intimation_19032026.pdf",
      "company_page": "https://withriver.in/won/SRM"
    },
    {
      "symbol": "INNOVISION",
      "company_name": "Innovision Limited",
      "kind": "order",
      "said_on": "2026-10-09",
      "due_on": "2027-04-09",
      "date_basis": "6 months",
      "date_is_approximate": false,
      "statement": "Regiment, Dehradun, for the supply of 225 units of 7-inch First Person View (FPV) Drones.",
      "value_text": null,
      "counterparty": "Indian Army, Ministry of Defence, through 15 Field Regiment, Dehradun",
      "source_filing": "https://nsearchives.nseindia.com/corporate/INNOVISION2007_09102026164205_Workorder_Aerodrone_091026_signed.pdf",
      "company_page": "https://withriver.in/won/INNOVISION"
    },
    {
      "symbol": "ADVAIT",
      "company_name": "Advait Energy Transitions Limited",
      "kind": "order",
      "said_on": "2026-08-11",
      "due_on": "2027-04-11",
      "date_basis": "8 Months",
      "date_is_approximate": false,
      "statement": "Contract for Design, Manufacturing & Supply of Emergency Restoration System (ERS) for 400KV and suitable to use for 220kV/132kV/66kV class transmission line from M/s GETCO.",
      "value_text": "Rs. 24,88,10,504.80/-",
      "counterparty": "GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED (GETCO)",
      "source_filing": "https://nsearchives.nseindia.com/corporate/ADVAITENERGY_11082026134945_AETL_SEintimation_order_s.pdf",
      "company_page": "https://withriver.in/won/ADVAIT"
    },
    {
      "symbol": "INNOVISION",
      "company_name": "Innovision Limited",
      "kind": "order",
      "said_on": "2026-04-08",
      "due_on": "2027-04-15",
      "date_basis": "From 15 April 2026 (08:00 hrs) to 15 April 2027 (07:59 hrs)",
      "date_is_approximate": false,
      "statement": "Scope includes toll collection, upkeep/maintenance of adjacent toilet blocks, and replenishment of consumables.",
      "value_text": "Rs. 99,35,29,635/-",
      "counterparty": "National Highways Authority of India (NHAI)",
      "source_filing": "https://nsearchives.nseindia.com/corporate/INNOVISION2007_08042026155948_Work_Order_Intimation_080426_LH_Signed.pdf",
      "company_page": "https://withriver.in/won/INNOVISION"
    },
    {
      "symbol": "SRM",
      "company_name": "SRM Contractors Limited",
      "kind": "order",
      "said_on": "2026-04-15",
      "due_on": "2027-04-15",
      "date_basis": "12 Months from the appointed date",
      "date_is_approximate": true,
      "statement": "230+100 between PANDOH TO KULLU Section of NH-03 (Old NH-21) in the State of Himachal Pradesh under NH(O) on EPC mode",
      "value_text": "Rs. 168 Crores",
      "counterparty": "(NHAI) National Highways Authority of India",
      "source_filing": "https://nsearchives.nseindia.com/corporate/SRMCONTRACT_15042026140905_order_intimation_19032026.pdf",
      "company_page": "https://withriver.in/won/SRM"
    },
    {
      "symbol": "INTERARCH",
      "company_name": "Interarch Building Solutions Limited",
      "kind": "order",
      "said_on": "2026-06-17",
      "due_on": "2027-04-17",
      "date_basis": "Approx. 10 months",
      "date_is_approximate": false,
      "statement": "Bagging/Receiving of Orders/Contracts",
      "value_text": "Rs.87 Crores",
      "counterparty": "Due to commercial issue, the Company cannot disclose the name of the Customer",
      "source_filing": "https://nsearchives.nseindia.com/corporate/INTERARCH1983_17062026110745_Regulation_30.pdf",
      "company_page": "https://withriver.in/won/INTERARCH"
    },
    {
      "symbol": "GOODLUCK",
      "company_name": "Goodluck India Limited",
      "kind": "order",
      "said_on": "2026-06-19",
      "due_on": "2027-04-19",
      "date_basis": "Within 10 Months as per delivery schedule",
      "date_is_approximate": false,
      "statement": "Within 10 Months as per delivery schedule",
      "value_text": "Rs. 255 Crores",
      "counterparty": null,
      "source_filing": "https://nsearchives.nseindia.com/corporate/GOODLUCK_19062026180642_Intimation_Order_Received.pdf",
      "company_page": "https://withriver.in/won/GOODLUCK"
    },
    {
      "symbol": "KMEW",
      "company_name": "Knowledge Marine & Engineering Works Limited",
      "kind": "order",
      "said_on": "2026-06-20",
      "due_on": "2027-04-20",
      "date_basis": "within 10 months",
      "date_is_approximate": false,
      "statement": "This contract assumes additional significance as it represents the first external commercial shipbuilding order from Government of India, secured by Knowledge Shipyard Private Limited (KSPL) as the lead member of the consortium since the establishment of KMEW's dedicated shipbuilding platform.",
      "value_text": "₹66.11 Crores",
      "counterparty": "Inland Waterway Authority of India",
      "source_filing": "https://nsearchives.nseindia.com/corporate/KMEW_20062026233911_Intimation_of_IWAI_20_Pax_Award.pdf",
      "company_page": "https://withriver.in/won/KMEW"
    },
    {
      "symbol": "INNOVISION",
      "company_name": "Innovision Limited",
      "kind": "order",
      "said_on": "2026-04-22",
      "due_on": "2027-04-22",
      "date_basis": "1 year from06.06.2026 08:00AM",
      "date_is_approximate": false,
      "statement": "Engagement of user fee agency on the basis Competitive Bidding at Vembukudi fee plaza at Km 152.000 of Cholapuram- Thanjavur Section from Km 116.440 to Km 164.275 of NH-45C in the state of Tamil Nadu and upkeep /maintenance of adjacent Toilet Blocks including recouping the consumable items.",
      "value_text": null,
      "counterparty": "NHAI (National Highways Authority of India)",
      "source_filing": "https://nsearchives.nseindia.com/corporate/INNOVISION2007_22042026184725_Work_Order_Intimation_220426-vembukudi_Signed.pdf",
      "company_page": "https://withriver.in/won/INNOVISION"
    },
    {
      "symbol": "PTCIL",
      "company_name": "PTC Industries Limited",
      "kind": "order",
      "said_on": "2026-07-24",
      "due_on": "2027-04-24",
      "date_basis": "9 Months",
      "date_is_approximate": false,
      "statement": "PTC Industries Receives Development Order from Gun Factory Kanpur for Major Artillery Gun Components",
      "value_text": null,
      "counterparty": "Ordnance Factory Kanpur, Unit of Advanced Weapons and Equipment India Limited",
      "source_filing": "https://nsearchives.nseindia.com/corporate/PTCINDUSTRIES_24072026115251_20260724_Press_Release_GunFactory_with_cover.pdf",
      "company_page": "https://withriver.in/won/PTCIL"
    },
    {
      "symbol": "QPOWER",
      "company_name": "Quality Power Electrical Equipments Limited",
      "kind": "order",
      "said_on": "2026-04-25",
      "due_on": "2027-04-25",
      "date_basis": "Approximately 12 months",
      "date_is_approximate": false,
      "statement": "Data Centre project in the United States of America; the identity of the customer has",
      "value_text": "INR 48.3 Crore",
      "counterparty": null,
      "source_filing": "https://nsearchives.nseindia.com/corporate/QPOWER1234_25042026190730_IntimationofReceiptofOrder25042026Sign.pdf",
      "company_page": "https://withriver.in/won/QPOWER"
    },
    {
      "symbol": "ADROITINFO",
      "company_name": "Adroit Infotech Limited",
      "kind": "order",
      "said_on": "2026-04-28",
      "due_on": "2027-04-28",
      "date_basis": "1 year",
      "date_is_approximate": false,
      "statement": "We are delighted to announce a significant milestone with the win of a major order worth INR 23.0 Millions.",
      "value_text": "INR 23.0 Millions",
      "counterparty": "PT SUPRA PRIMATAMA NUSANTARA",
      "source_filing": "https://nsearchives.nseindia.com/corporate/ADROITINFO_28042026174947_DisclosureIntimationReg30PressReleasePTSupra.pdf",
      "company_page": "https://withriver.in/won/ADROITINFO"
    },
    {
      "symbol": "KSOLVES",
      "company_name": "Ksolves India Limited",
      "kind": "order",
      "said_on": "2026-09-28",
      "due_on": "2027-04-28",
      "date_basis": "7 months",
      "date_is_approximate": false,
      "statement": "HO/49/14/14(7)2025-CFD-POD2/I/3762/2026 dated January 30, 2026, we wish to inform you that the Company has received a new order worth USD 0.5 million (United States Dollars zero point five million) from Demerara Bank",
      "value_text": "USD 0.5 million",
      "counterparty": "Demerara Bank Limited",
      "source_filing": "https://nsearchives.nseindia.com/corporate/KSOLVES_28092026095554_Demeraraorder.pdf",
      "company_page": "https://withriver.in/won/KSOLVES"
    },
    {
      "symbol": "3IINFOLTD",
      "company_name": "3i Infotech Limited",
      "kind": "order",
      "said_on": "2026-07-07",
      "due_on": "2027-04-30",
      "date_basis": "12 Months (May 1, 2026 to April 30, 2027)",
      "date_is_approximate": false,
      "statement": "The engagement includes consulting services and solutions based on UiPath RPA, Blue Prism, Pega Platform and Datamatics TruBot, as well as Process and Factory Automation technologies and systems.",
      "value_text": "INR 45.85 crore",
      "counterparty": "Vedant Consultancy FZ LLC, UAE",
      "source_filing": "https://nsearchives.nseindia.com/corporate/3IINFOTECHLTD_07072026223100_Disclosure.pdf",
      "company_page": "https://withriver.in/won/3IINFOLTD"
    },
    {
      "symbol": "INTERARCH",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-05-21",
      "due_on": "2027-04-30",
      "date_basis": "March-April 2027",
      "date_is_approximate": false,
      "statement": "with the Gujarat plant, that will be our fifth fully integrated plant, and that will give us capacity of about Rs. 2,500 crores in pre-engineered buildings and heavy structure will add in this year, maybe by next March, we will have about 40,000 tons, 20,000 tons is already going in line by August, and 20,000 tons more hopefully by March, April next year",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/INTERARCH"
    },
    {
      "symbol": "YATHARTH",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-05-25",
      "due_on": "2027-04-30",
      "date_basis": "April 2027",
      "date_is_approximate": false,
      "statement": "Expected Operationalisation April 2027",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/YATHARTH"
    }
  ],
  "other_months": [
    {
      "period": "2028-10",
      "commitments": 9,
      "url": "https://withriver.in/clock/2028-10",
      "data": "https://withriver.in/clock/2028-10/data.json"
    },
    {
      "period": "2028-09",
      "commitments": 14,
      "url": "https://withriver.in/clock/2028-09",
      "data": "https://withriver.in/clock/2028-09/data.json"
    },
    {
      "period": "2028-08",
      "commitments": 15,
      "url": "https://withriver.in/clock/2028-08",
      "data": "https://withriver.in/clock/2028-08/data.json"
    },
    {
      "period": "2028-07",
      "commitments": 8,
      "url": "https://withriver.in/clock/2028-07",
      "data": "https://withriver.in/clock/2028-07/data.json"
    },
    {
      "period": "2028-06",
      "commitments": 8,
      "url": "https://withriver.in/clock/2028-06",
      "data": "https://withriver.in/clock/2028-06/data.json"
    },
    {
      "period": "2028-05",
      "commitments": 17,
      "url": "https://withriver.in/clock/2028-05",
      "data": "https://withriver.in/clock/2028-05/data.json"
    },
    {
      "period": "2028-04",
      "commitments": 20,
      "url": "https://withriver.in/clock/2028-04",
      "data": "https://withriver.in/clock/2028-04/data.json"
    },
    {
      "period": "2028-03",
      "commitments": 45,
      "url": "https://withriver.in/clock/2028-03",
      "data": "https://withriver.in/clock/2028-03/data.json"
    },
    {
      "period": "2028-02",
      "commitments": 13,
      "url": "https://withriver.in/clock/2028-02",
      "data": "https://withriver.in/clock/2028-02/data.json"
    },
    {
      "period": "2028-01",
      "commitments": 7,
      "url": "https://withriver.in/clock/2028-01",
      "data": "https://withriver.in/clock/2028-01/data.json"
    },
    {
      "period": "2027-12",
      "commitments": 12,
      "url": "https://withriver.in/clock/2027-12",
      "data": "https://withriver.in/clock/2027-12/data.json"
    },
    {
      "period": "2027-11",
      "commitments": 13,
      "url": "https://withriver.in/clock/2027-11",
      "data": "https://withriver.in/clock/2027-11/data.json"
    },
    {
      "period": "2027-10",
      "commitments": 17,
      "url": "https://withriver.in/clock/2027-10",
      "data": "https://withriver.in/clock/2027-10/data.json"
    },
    {
      "period": "2027-09",
      "commitments": 35,
      "url": "https://withriver.in/clock/2027-09",
      "data": "https://withriver.in/clock/2027-09/data.json"
    },
    {
      "period": "2027-08",
      "commitments": 27,
      "url": "https://withriver.in/clock/2027-08",
      "data": "https://withriver.in/clock/2027-08/data.json"
    },
    {
      "period": "2027-07",
      "commitments": 23,
      "url": "https://withriver.in/clock/2027-07",
      "data": "https://withriver.in/clock/2027-07/data.json"
    },
    {
      "period": "2027-06",
      "commitments": 28,
      "url": "https://withriver.in/clock/2027-06",
      "data": "https://withriver.in/clock/2027-06/data.json"
    },
    {
      "period": "2027-05",
      "commitments": 19,
      "url": "https://withriver.in/clock/2027-05",
      "data": "https://withriver.in/clock/2027-05/data.json"
    },
    {
      "period": "2027-04",
      "commitments": 20,
      "url": "https://withriver.in/clock/2027-04",
      "data": "https://withriver.in/clock/2027-04/data.json"
    },
    {
      "period": "2027-03",
      "commitments": 271,
      "url": "https://withriver.in/clock/2027-03",
      "data": "https://withriver.in/clock/2027-03/data.json"
    },
    {
      "period": "2027-02",
      "commitments": 15,
      "url": "https://withriver.in/clock/2027-02",
      "data": "https://withriver.in/clock/2027-02/data.json"
    },
    {
      "period": "2027-01",
      "commitments": 28,
      "url": "https://withriver.in/clock/2027-01",
      "data": "https://withriver.in/clock/2027-01/data.json"
    },
    {
      "period": "2026-12",
      "commitments": 54,
      "url": "https://withriver.in/clock/2026-12",
      "data": "https://withriver.in/clock/2026-12/data.json"
    },
    {
      "period": "2026-11",
      "commitments": 33,
      "url": "https://withriver.in/clock/2026-11",
      "data": "https://withriver.in/clock/2026-11/data.json"
    },
    {
      "period": "2026-10",
      "commitments": 28,
      "url": "https://withriver.in/clock/2026-10",
      "data": "https://withriver.in/clock/2026-10/data.json"
    },
    {
      "period": "2026-09",
      "commitments": 60,
      "url": "https://withriver.in/clock/2026-09",
      "data": "https://withriver.in/clock/2026-09/data.json"
    },
    {
      "period": "2026-08",
      "commitments": 28,
      "url": "https://withriver.in/clock/2026-08",
      "data": "https://withriver.in/clock/2026-08/data.json"
    },
    {
      "period": "2026-07",
      "commitments": 10,
      "url": "https://withriver.in/clock/2026-07",
      "data": "https://withriver.in/clock/2026-07/data.json"
    },
    {
      "period": "2026-06",
      "commitments": 18,
      "url": "https://withriver.in/clock/2026-06",
      "data": "https://withriver.in/clock/2026-06/data.json"
    },
    {
      "period": "2026-05",
      "commitments": 11,
      "url": "https://withriver.in/clock/2026-05",
      "data": "https://withriver.in/clock/2026-05/data.json"
    },
    {
      "period": "2026-04",
      "commitments": 2,
      "url": "https://withriver.in/clock/2026-04",
      "data": "https://withriver.in/clock/2026-04/data.json"
    },
    {
      "period": "2026-03",
      "commitments": 6,
      "url": "https://withriver.in/clock/2026-03",
      "data": "https://withriver.in/clock/2026-03/data.json"
    }
  ]
}