  "source_name": "River",
  "canonical": "https://withriver.in/clock/2026-12",
  "description": "54 dated commitments from 33 NSE-listed companies falling due in December 2026, each with the company's own words and the filing it came from.",
  "method": "Every row is a date an Indian listed company stated in a filing with the NSE, resolved to a calendar day from the company's own words. The phrase the date was read out of is given as date_basis so the resolution can be checked. date_is_approximate is true where the company counted from a date it did not state -- 'within 18 months of the appointed date' -- in which case River counted from the filing date and marks it rather than presenting an estimate as a stated date. Nothing here says whether the commitment was met: a listed company must disclose winning an order, and amending or terminating one, but is not required to disclose completing one.",
  "license": "Free to quote and reproduce with attribution to River (withriver.in). Underlying documents are public filings of the National Stock Exchange of India.",
  "attribution": "River — withriver.in",
  "generated_at": "2026-10-28T15:18:19.202Z",
  "period": "2026-12",
  "period_label": "December 2026",
  "period_has_ended": false,
  "totals": {
    "commitments": 54,
    "companies": 33,
    "order_delivery_windows": 28,
    "management_statements": 26,
    "dates_resolved_from_an_assumed_anchor": 2,
    "value_inr_crore": 1386.05,
    "commitments_with_a_stated_value": 25
  },
  "commitments": [
    {
      "symbol": "TEXRAIL",
      "company_name": "Texmaco Rail & Engineering Limited",
      "kind": "order",
      "said_on": "2026-07-01",
      "due_on": "2026-12-01",
      "date_basis": "Within 13.5 months from On or before 31st October",
      "date_is_approximate": false,
      "statement": "JSW (South) Rail Logistics Private Limited – Rs. 253.28 Crores",
      "value_text": "Rs. 253.28 Crores",
      "counterparty": "JSW (South) Rail Sushila Transport Private",
      "source_filing": "https://nsearchives.nseindia.com/corporate/TEXRAIL_01072026224545_TexRailSEOrderSTPLJSWKKRSIR01072026.pdf",
      "company_page": "https://withriver.in/won/TEXRAIL"
    },
    {
      "symbol": "MCLOUD",
      "company_name": "Magellanic Cloud Limited",
      "kind": "order",
      "said_on": "2026-06-02",
      "due_on": "2026-12-02",
      "date_basis": "6 Months",
      "date_is_approximate": false,
      "statement": "Provigil Surveillance Limited, a wholly owned subsidiary of the Company, has received a Letter of Acceptance (LOA) from East Coast Railway, Sambalpur Division, for an aggregate contract value of ₹9.72 Crore (approximately).",
      "value_text": "₹9.72 Crore",
      "counterparty": "East Coast Railway, Sambalpur Division",
      "source_filing": "https://nsearchives.nseindia.com/corporate/MCLOUD_02062026140002_SEUpload.pdf",
      "company_page": "https://withriver.in/won/MCLOUD"
    },
    {
      "symbol": "MCLOUD",
      "company_name": "Magellanic Cloud Limited",
      "kind": "order",
      "said_on": "2026-06-02",
      "due_on": "2026-12-02",
      "date_basis": "6 Months",
      "date_is_approximate": false,
      "statement": "Surveillance Limited, a wholly owned subsidiary of the Company, has received a Letter of Acceptance (LOA) from South Western Railway, Hubli Division, for an aggregate contract value of INR 4.31 Crore Approx.",
      "value_text": "INR 4.31 Crore",
      "counterparty": "South Western Railway, Hubli Division",
      "source_filing": "https://nsearchives.nseindia.com/corporate/MCLOUD_02062026143458_Hubli_Order_-_Final_NSE_PR.pdf",
      "company_page": "https://withriver.in/won/MCLOUD"
    },
    {
      "symbol": "SAATVIKGL",
      "company_name": "Saatvik Green Energy Limited",
      "kind": "order",
      "said_on": "2026-10-10",
      "due_on": "2026-12-09",
      "date_basis": "within 60 days",
      "date_is_approximate": false,
      "statement": "Systems (SPWPS) within 60 days from date of issuance of NTP/work order from circle office.",
      "value_text": null,
      "counterparty": "Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL)",
      "source_filing": "https://nsearchives.nseindia.com/corporate/SAATVIK_10102026182930_reg30greenorder.pdf",
      "company_page": "https://withriver.in/won/SAATVIKGL"
    },
    {
      "symbol": "BMWVENTLTD",
      "company_name": "BMW Ventures Limited",
      "kind": "order",
      "said_on": "2026-03-10",
      "due_on": "2026-12-10",
      "date_basis": "within 9 months",
      "date_is_approximate": false,
      "statement": "Awarding of order(s)/contract(s) — BMW Ventures Limited has informed the Exchange about Awarding of order(s)/contract(s)",
      "value_text": "15.91 crore",
      "counterparty": null,
      "source_filing": "https://nsearchives.nseindia.com/corporate/BMWVENTURES2024_10032026135123_PEB_ORDER.pdf",
      "company_page": "https://withriver.in/won/BMWVENTLTD"
    },
    {
      "symbol": "MARSONS",
      "company_name": "Marsons Limited",
      "kind": "order",
      "said_on": "2026-06-10",
      "due_on": "2026-12-10",
      "date_basis": "6 months",
      "date_is_approximate": false,
      "statement": "GST) (Thirty Three Crore Eighteen Lakhs Eighty Five Thousand Seven Hundred and Thirty only) from Vikran Engineering Limited for NTPC Renewable Energy Project.",
      "value_text": "₹33,18,85,730.00",
      "counterparty": "Vikran Engineering Limited for NTPC Renewable Energy Project",
      "source_filing": "https://nsearchives.nseindia.com/corporate/MARSONS_10062026113542_disclosure_vikran.pdf",
      "company_page": "https://withriver.in/won/MARSONS"
    },
    {
      "symbol": "3IINFOLTD",
      "company_name": "3i Infotech Limited",
      "kind": "order",
      "said_on": "2026-07-14",
      "due_on": "2026-12-14",
      "date_basis": "5 months",
      "date_is_approximate": false,
      "statement": "The total value of the SOW is USD 154,165 (Rs.1.47 Cr approx.), exclusive of applicable taxes.",
      "value_text": "Rs.1.47 Cr",
      "counterparty": null,
      "source_filing": "https://nsearchives.nseindia.com/corporate/3IINFOTECHLTD_14072026151920_Disclosure.pdf",
      "company_page": "https://withriver.in/won/3IINFOLTD"
    },
    {
      "symbol": "INTERARCH",
      "company_name": "Interarch Building Solutions Limited",
      "kind": "order",
      "said_on": "2026-04-18",
      "due_on": "2026-12-18",
      "date_basis": "8 months",
      "date_is_approximate": false,
      "statement": "Bagging/Receiving of Orders/Contracts",
      "value_text": "Rs.60 Crores",
      "counterparty": "Due to commercial issue, the Company cannot disclose the name of the Customer",
      "source_filing": "https://nsearchives.nseindia.com/corporate/INTERARCH1983_18042026114023_Bagging_of_order_17042026.pdf",
      "company_page": "https://withriver.in/won/INTERARCH"
    },
    {
      "symbol": "TIGERLOGS",
      "company_name": "Tiger Logistics (India) Limited",
      "kind": "order",
      "said_on": "2026-06-18",
      "due_on": "2026-12-18",
      "date_basis": "6 months tentatively",
      "date_is_approximate": false,
      "statement": "The project involves movement of 13 over-dimensional cargo units (each weighing 89 MT) from Italy to India and carries a total value of approximately ₹4 crore, including handling charges.",
      "value_text": "₹4 crore",
      "counterparty": "Bharat Heavy Electricals Limited (BHEL)",
      "source_filing": "https://nsearchives.nseindia.com/corporate/TIGER_18062026200631_BHEL_Press_Release.pdf",
      "company_page": "https://withriver.in/won/TIGERLOGS"
    },
    {
      "symbol": "GPTINFRA",
      "company_name": "GPT Infraprojects Limited",
      "kind": "order",
      "said_on": "2026-09-17",
      "due_on": "2026-12-21",
      "date_basis": "1,095 days from Appointed Date",
      "date_is_approximate": true,
      "statement": "GPTINFRA Bags Order Valued at ₹ 483.72 Crore",
      "value_text": "₹ 483.72 Crore",
      "counterparty": "Chief Project Manager, Rail Vikas Nigam Limited, Bhubaneshwar",
      "source_filing": "https://nsearchives.nseindia.com/corporate/GPTINFRA_17092026184749_Press_Release_intimation_Contract_win_480_Cr_170926_SGD.pdf",
      "company_page": "https://withriver.in/won/GPTINFRA"
    },
    {
      "symbol": "REFEX",
      "company_name": "Refex Industries Limited",
      "kind": "order",
      "said_on": "2026-08-24",
      "due_on": "2026-12-22",
      "date_basis": "to be executed 120 Days",
      "date_is_approximate": false,
      "statement": "You are requested to take the above information on records and disseminate the same on your websites.",
      "value_text": "₹ 33.70 crores",
      "counterparty": null,
      "source_filing": "https://nsearchives.nseindia.com/corporate/REFEX2002_24082026194804_RIL_order_Fly_Ash_sd.pdf",
      "company_page": "https://withriver.in/won/REFEX"
    },
    {
      "symbol": "SILVERTUC",
      "company_name": "Silver Touch Technologies Limited",
      "kind": "order",
      "said_on": "2026-09-26",
      "due_on": "2026-12-25",
      "date_basis": "within 90 days",
      "date_is_approximate": false,
      "statement": "This order from a premier centre of the Indian Space Research Organisation represents a meaningful step in the Company’s stated focus on the Space and Defence sector:  Entry into a mission-critical institution: SAC is ISRO’s principal centre for the design of space-borne payloads and for satellite-based applications.",
      "value_text": null,
      "counterparty": "Space Applications Centre",
      "source_filing": "https://nsearchives.nseindia.com/corporate/SILVERTUC_26092026144232_Receipt_of_Order.pdf",
      "company_page": "https://withriver.in/won/SILVERTUC"
    },
    {
      "symbol": "BMWVENTLTD",
      "company_name": "BMW Ventures Limited",
      "kind": "order",
      "said_on": "2026-02-26",
      "due_on": "2026-12-26",
      "date_basis": "within 10 months",
      "date_is_approximate": false,
      "statement": "Awarding of order(s)/contract(s) — BMW Ventures Limited has informed the Exchange about Awarding of order(s)/contract(s)",
      "value_text": "36 crore",
      "counterparty": null,
      "source_filing": "https://nsearchives.nseindia.com/corporate/BMWVENTURES2024_26022026144749_peb_order_36_crore.pdf",
      "company_page": "https://withriver.in/won/BMWVENTLTD"
    },
    {
      "symbol": "HECPROJECT",
      "company_name": "HEC Infra Projects Limited",
      "kind": "order",
      "said_on": "2026-05-27",
      "due_on": "2026-12-27",
      "date_basis": "7 months",
      "date_is_approximate": false,
      "statement": "Further, we hereby confirm that none of the promoters/promoter grollp have any interest in the entity/entities from whom the order/contract is received and the award of order does not fall within the purview of related party transactions.",
      "value_text": "Rs.8.23 crores",
      "counterparty": "Stellar Manufacturers Private Limited",
      "source_filing": "https://nsearchives.nseindia.com/corporate/HECPROJECT_27052026143457_wo_stellar.pdf",
      "company_page": "https://withriver.in/won/HECPROJECT"
    },
    {
      "symbol": "VIVIANA",
      "company_name": "Viviana Power Tech Limited",
      "kind": "order",
      "said_on": "2026-08-27",
      "due_on": "2026-12-27",
      "date_basis": "24 ( Twenty Four) Months from the Date of LOA",
      "date_is_approximate": true,
      "statement": "Size of Order: Rs.9,74,02,648.00 (Rupees Nine Crore Seventy Four Lakhs Two Thousand Six",
      "value_text": "Rs.9,74,02,648.00",
      "counterparty": "Gujarat Energy Transmission Corporation Limited (GETCO)",
      "source_filing": "https://nsearchives.nseindia.com/corporate/VIVIANA_27082026145941_VIVIANA__Intimation_of_Receiving_Order_GETCO_27082026.pdf",
      "company_page": "https://withriver.in/won/VIVIANA"
    },
    {
      "symbol": "CEINSYS",
      "company_name": "Ceinsys Tech Limited",
      "kind": "order",
      "said_on": "2026-04-29",
      "due_on": "2026-12-29",
      "date_basis": "Implementation: 8 months AMC: 32 Months",
      "date_is_approximate": false,
      "statement": "Letter of Acceptance from MEPA for execution",
      "value_text": "Rs. 20,85,16,017",
      "counterparty": "MEPA",
      "source_filing": "https://nsearchives.nseindia.com/corporate/CEINSYSTECH_29042026120559_SE_Intimation_under_Reg_30-Receipt_of_Letter_of_Acceptance-MEPA_Georgia.pdf",
      "company_page": "https://withriver.in/won/CEINSYS"
    },
    {
      "symbol": "HILINFRA",
      "company_name": "Highway Infrastructure Limited",
      "kind": "order",
      "said_on": "2026-09-30",
      "due_on": "2026-12-29",
      "date_basis": "90 Days",
      "date_is_approximate": false,
      "statement": "Infrastructure Limited has received the Letter of Acceptance (LOA) of Rs.24,45,99,930 (Rupees Twenty-Four Crore Forty-Five Lakh Ninety-Nine Thousand Nine Hundred and Thirty",
      "value_text": "Rs.24,45,99,930",
      "counterparty": "National Highways Authority of India (NHAI)",
      "source_filing": "https://nsearchives.nseindia.com/corporate/HIGHWAY123_30092026211828_HIL_Reg30_Vellanchettiyur_30092026.pdf",
      "company_page": "https://withriver.in/won/HILINFRA"
    },
    {
      "symbol": "HILINFRA",
      "company_name": "Highway Infrastructure Limited",
      "kind": "order",
      "said_on": "2026-10-01",
      "due_on": "2026-12-30",
      "date_basis": "to be executed over a period of 90 days",
      "date_is_approximate": false,
      "statement": "The contract carries a value of Rs. 24.46 crore and was awarded on September 30, 2026",
      "value_text": "Rs. 24.46 crore",
      "counterparty": "NHAI",
      "source_filing": "https://nsearchives.nseindia.com/corporate/HIGHWAY123_01102026160327_HIL_PR_01102026.pdf",
      "company_page": "https://withriver.in/won/HILINFRA"
    },
    {
      "symbol": "LATTEYS",
      "company_name": "Latteys Industries Limited",
      "kind": "order",
      "said_on": "2026-07-03",
      "due_on": "2026-12-30",
      "date_basis": "Within 180 days",
      "date_is_approximate": false,
      "statement": "Design, Manufacture, Supply, Transport, Installation, Testing and Commissioning of Off‐Grid DC Solar Photovoltaic Water Pumping Systems. Awarded by Maharashtra State Electricity Distribution Company Limited",
      "value_text": "Rs. 22 Crores",
      "counterparty": "Maharashtra State Electricity Distribution Company Limited",
      "source_filing": "https://nsearchives.nseindia.com/corporate/LATTEYS_03072026153228_Disclosure03072026.pdf",
      "company_page": "https://withriver.in/won/LATTEYS"
    },
    {
      "symbol": "AEROFLEX",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-07-30",
      "due_on": "2026-12-31",
      "date_basis": "Q3 FY27",
      "date_is_approximate": false,
      "statement": "we have planned to increase the production from 17.5 million meters per annum currently to 20 million meters per annum and it should be completed by Q3 of this financial year",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/AEROFLEX"
    },
    {
      "symbol": "AEROFLEX",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-07-30",
      "due_on": "2026-12-31",
      "date_basis": "Q3 FY27",
      "date_is_approximate": false,
      "statement": "by Q3 of this financial year, most of the capex that we had planned last year would be completed",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/AEROFLEX"
    },
    {
      "symbol": "AEROFLEX",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-07-27",
      "due_on": "2026-12-31",
      "date_basis": "Q3FY27",
      "date_is_approximate": false,
      "statement": "Target (Q3FY27) 20.0 Mn Meters",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/AEROFLEX"
    },
    {
      "symbol": "AEROFLEX",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-07-27",
      "due_on": "2026-12-31",
      "date_basis": "Q3FY27",
      "date_is_approximate": false,
      "statement": "Target (Q3FY27) 15,000 Skids",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/AEROFLEX"
    },
    {
      "symbol": "AFFORDABLE",
      "company_name": "Affordable Robotic & Automation Limited",
      "kind": "order",
      "said_on": "2026-09-08",
      "due_on": "2026-12-31",
      "date_basis": "Material Should be Delivered by December 2026",
      "date_is_approximate": false,
      "statement": "Turnkey Project. Awarded by Not disclosed due to confidentiality",
      "value_text": "₹ 13,66,33,424/-",
      "counterparty": null,
      "source_filing": "https://nsearchives.nseindia.com/corporate/AFFORDABLE_08092026102252_Reg30ReceiptofPO008092026.pdf",
      "company_page": "https://withriver.in/won/AFFORDABLE"
    },
    {
      "symbol": "ATHERENERG",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-08-03",
      "due_on": "2026-12-31",
      "date_basis": "Q3 FY27",
      "date_is_approximate": false,
      "statement": "PHASE 2 on track for Q3 FY 27",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/ATHERENERG"
    },
    {
      "symbol": "ATHERENERG",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-08-07",
      "due_on": "2026-12-31",
      "date_basis": "Q3 FY2027",
      "date_is_approximate": false,
      "statement": "The big upside here is awaited with Factory 3.0 going live in Q3 FY 2027.",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/ATHERENERG"
    },
    {
      "symbol": "ATHERENERG",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-08-03",
      "due_on": "2026-12-31",
      "date_basis": "Q3 FY27",
      "date_is_approximate": false,
      "statement": "Factory 3.0 going live in Q3 FY 27",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/ATHERENERG"
    },
    {
      "symbol": "DEEDEV",
      "company_name": "DEE Development Engineers Limited",
      "kind": "order",
      "said_on": "2026-02-27",
      "due_on": "2026-12-31",
      "date_basis": "December 2026",
      "date_is_approximate": false,
      "statement": "Palwal, Haryana- 121102, India Works: Unit 1, 2 & 3, Village Tatarpur, Dist.",
      "value_text": "INR 58 Crores",
      "counterparty": null,
      "source_filing": "https://nsearchives.nseindia.com/corporate/DDEL_27022026080949_BSENSESIGNED.pdf",
      "company_page": "https://withriver.in/won/DEEDEV"
    },
    {
      "symbol": "DIFFNKG",
      "company_name": "Diffusion Engineers Limited",
      "kind": "order",
      "said_on": "2026-04-23",
      "due_on": "2026-12-31",
      "date_basis": "Up to December 31, 2026",
      "date_is_approximate": false,
      "statement": "Supply of Vertical Roller Mill and Separators Parts. Awarded by Domestic Client",
      "value_text": "INR 09.88 Crores",
      "counterparty": null,
      "source_filing": "https://nsearchives.nseindia.com/corporate/DIFFUSION_23042026125041_RecieptofOrder23042026.pdf",
      "company_page": "https://withriver.in/won/DIFFNKG"
    },
    {
      "symbol": "EPACKPEB",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-05-18",
      "due_on": "2026-12-31",
      "date_basis": "by Nov/Dec 2026",
      "date_is_approximate": false,
      "statement": "we expect our new northern line to be commissioned by Nov/Dec 2026 to capture the peak cold storage cycle",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/EPACKPEB"
    },
    {
      "symbol": "EPACKPEB",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-05-18",
      "due_on": "2026-12-31",
      "date_basis": "by Q3 FY27",
      "date_is_approximate": false,
      "statement": "Work started in Q4 and is expected to be done by Q3 FY 27",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/EPACKPEB"
    },
    {
      "symbol": "EPACKPEB",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-08-06",
      "due_on": "2026-12-31",
      "date_basis": "Q3 FY27",
      "date_is_approximate": false,
      "statement": "the Ghiloth sandwich panel line would be commissioned by the end of this quarter, so commercial production likely to start from the next quarter onwards",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/EPACKPEB"
    },
    {
      "symbol": "EPACKPEB",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-08-02",
      "due_on": "2026-12-31",
      "date_basis": "by Q3 FY27",
      "date_is_approximate": false,
      "statement": "Work started in Q4 and is expected to be done by Q3 FY 27",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/EPACKPEB"
    },
    {
      "symbol": "EPACKPEB",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-08-06",
      "due_on": "2026-12-31",
      "date_basis": "Q3 FY27",
      "date_is_approximate": false,
      "statement": "the Andhra Pradesh second line should come up again in the next quarter, so starting of next quarter",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/EPACKPEB"
    },
    {
      "symbol": "EPACKPEB",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-05-20",
      "due_on": "2026-12-31",
      "date_basis": "Q3 FY27",
      "date_is_approximate": false,
      "statement": "By end of quarter three, we should add another 8 lakh in the Ghiloth plant, which will take our sandwich panel capacity to about 21,10,000 square meter.",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/EPACKPEB"
    },
    {
      "symbol": "EPACKPEB",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-05-20",
      "due_on": "2026-12-31",
      "date_basis": "Q3 FY27",
      "date_is_approximate": false,
      "statement": "our Ghiloth greenfield project in Noida in North India. It is progressing very well, and we expect commercial production from this new continuous sandwich panel line to come up in the quarter three in the month of October-November.",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/EPACKPEB"
    },
    {
      "symbol": "FOCUS",
      "company_name": "Focus Lighting and Fixtures Limited",
      "kind": "order",
      "said_on": "2026-09-12",
      "due_on": "2026-12-31",
      "date_basis": "order is scheduled to be executed/delivered by December 2026",
      "date_is_approximate": false,
      "statement": "Commercial Order. Awarded by Ingka Centres Private Limited",
      "value_text": "10 crores",
      "counterparty": "Ingka Centres Private Limited",
      "source_filing": "https://nsearchives.nseindia.com/corporate/FOCUS_12092026152457_SEaward.pdf",
      "company_page": "https://withriver.in/won/FOCUS"
    },
    {
      "symbol": "FOCUS",
      "company_name": "Focus Lighting and Fixtures Limited",
      "kind": "order",
      "said_on": "2026-09-12",
      "due_on": "2026-12-31",
      "date_basis": "order is scheduled to be executed/delivered by December 2026",
      "date_is_approximate": false,
      "statement": "We are pleased to inform you that the Company has bagged a significant order from Ingka Centres India Private Limited having an aggregate order value in the range of Rs.5-10 crores, for the purpose of manufacture, supply, and delivery of LED Lights and Fixtures.",
      "value_text": "10 crores",
      "counterparty": "Ingka Centres India Private Limited",
      "source_filing": "https://nsearchives.nseindia.com/corporate/FOCUS_12092026164433_SErevisedorder.pdf",
      "company_page": "https://withriver.in/won/FOCUS"
    },
    {
      "symbol": "GOLDIAM",
      "company_name": "Goldiam International Limited",
      "kind": "order",
      "said_on": "2026-09-08",
      "due_on": "2026-12-31",
      "date_basis": "On or before December 31, 2026",
      "date_is_approximate": false,
      "statement": "Please note that this figure does not include our online orders, further these orders are expected to be fulfilled on or before December 31, 2026, ensuring strong momentum for the Company in the near term.",
      "value_text": "Rs.60 crores",
      "counterparty": null,
      "source_filing": "https://nsearchives.nseindia.com/corporate/GOLDIAM_08092026125633_Intimation_of_export_order-8-9-26.pdf",
      "company_page": "https://withriver.in/won/GOLDIAM"
    },
    {
      "symbol": "HFCL",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-07-29",
      "due_on": "2026-12-31",
      "date_basis": "by December 2026",
      "date_is_approximate": false,
      "statement": "The expansion of our Optical Fibre manufacturing capacity from 28 million fibre kilometres to 34 million fibre kilometres is progressing well and will be completed by December 2026.",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/HFCL"
    },
    {
      "symbol": "IDEAFORGE",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-08-18",
      "due_on": "2026-12-31",
      "date_basis": "by Q3 FY27",
      "date_is_approximate": false,
      "statement": "we remain focused on completing delivery of the remaining order book of INR256.8 crores by Q3 as per customer timelines.",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/IDEAFORGE"
    },
    {
      "symbol": "IEX",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-07-31",
      "due_on": "2026-12-31",
      "date_basis": "within extension period (by December 2026)",
      "date_is_approximate": false,
      "statement": "we have to bring this down to 25% within 5 years. In fact, this 5-year period was over in the month of December 2025. So, we took an extension of one year from the PNGRB. And therefore, to sell this 22.3% equity, we have offered that in the IPO.",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/IEX"
    },
    {
      "symbol": "MANORAMA",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-08-18",
      "due_on": "2026-12-31",
      "date_basis": "Q3 FY27",
      "date_is_approximate": false,
      "statement": "the balance is intended to be implemented in a manner during FY27 around Quarter 3 of this financial year, subject to operational time lines.",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/MANORAMA"
    },
    {
      "symbol": "NUVAMA",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-05-18",
      "due_on": "2026-12-31",
      "date_basis": "middle of Q3 FY27",
      "date_is_approximate": false,
      "statement": "These offerings are expected to go live by middle of Q3, and this will help us further increase our market share in the domestic clients.",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/NUVAMA"
    },
    {
      "symbol": "NUVAMA",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-08-05",
      "due_on": "2026-12-31",
      "date_basis": "by end of Q3 FY27",
      "date_is_approximate": false,
      "statement": "the target is to deploy about 70% of the AUM in the next maybe 2-3 months so that by end of Q3, we can launch the second fund, which we want to have around INR4,000 to INR5,000 crores again",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/NUVAMA"
    },
    {
      "symbol": "NUVAMA",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-08-05",
      "due_on": "2026-12-31",
      "date_basis": "Q3 FY27",
      "date_is_approximate": false,
      "statement": "middle to end of quarter 3, we will see the launch of our first private credit fund.",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/NUVAMA"
    },
    {
      "symbol": "PNGJL",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-08-04",
      "due_on": "2026-12-31",
      "date_basis": "Q3 FY27 / FY28",
      "date_is_approximate": false,
      "statement": "80% I feel should be doable before Diwali or maybe quarter three. We can target 80% to be around about quarter three and next year we should be touching 90% plus 100% there in the range of 90% to 100%",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/PNGJL"
    },
    {
      "symbol": "RBZJEWEL",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-05-19",
      "due_on": "2026-12-31",
      "date_basis": "calendar year 2026",
      "date_is_approximate": false,
      "statement": "the third and the fourth store, still, it is a little early to give, but we should be opening in the season time... Yes, within this calendar year",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/RBZJEWEL"
    },
    {
      "symbol": "RBZJEWEL",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-08-17",
      "due_on": "2026-12-31",
      "date_basis": "Q2-Q3 FY27",
      "date_is_approximate": false,
      "statement": "Surat will be launching in Quarter 2 and Rajkot in early Quarter 3. And same, I think Maninagar and Gandhinagar both will be launched in Quarter 3 itself. So three stores in Quarter 3 and one store in Quarter 2, that is Surat.",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/RBZJEWEL"
    },
    {
      "symbol": "RBZJEWEL",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-05-19",
      "due_on": "2026-12-31",
      "date_basis": "calendar year 2026",
      "date_is_approximate": false,
      "statement": "in this calendar year, 4 stores is what is coming up, 2 large and 2 mid",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/RBZJEWEL"
    },
    {
      "symbol": "SAATVIKGL",
      "company_name": "Saatvik Green Energy Limited",
      "kind": "order",
      "said_on": "2026-07-22",
      "due_on": "2026-12-31",
      "date_basis": "Order will be executed by December 2026",
      "date_is_approximate": false,
      "statement": "Enc.: a/a Saatvik Green Energy Limited (formerly known as Saatvik Green Energy Private Limited) (a Saatvik Group Company)",
      "value_text": "INR 138 Crores",
      "counterparty": "Received order from renowned Independent Power producer/EPC Player",
      "source_filing": "https://nsearchives.nseindia.com/corporate/SAATVIK_22072026185940_Intimationstxsd.pdf",
      "company_page": "https://withriver.in/won/SAATVIKGL"
    },
    {
      "symbol": "TARACHAND",
      "company_name": "Tara Chand InfraLogistic Solutions Limited",
      "kind": "order",
      "said_on": "2026-10-19",
      "due_on": "2026-12-31",
      "date_basis": "Q3 FY27 upto Q4 FY29 Q3 FY27 upto Q4 FY28",
      "date_is_approximate": false,
      "statement": "Bagging/Receiving of orders/contracts — Tara Chand InfraLogistic Solutions Limited has informed the Exchange about Bagging/Receiving of orders/contracts",
      "value_text": null,
      "counterparty": null,
      "source_filing": "https://nsearchives.nseindia.com/corporate/TARACHAND_19102026161432_Business_Update.pdf",
      "company_page": "https://withriver.in/won/TARACHAND"
    },
    {
      "symbol": "TEXRAIL",
      "company_name": "Texmaco Rail & Engineering Limited",
      "kind": "order",
      "said_on": "2026-04-01",
      "due_on": "2026-12-31",
      "date_basis": "Delivery of the rakes shall be completed within 31st December, 2026",
      "date_is_approximate": false,
      "statement": "Nature of order(s) / contract(s) Auto Car Taller Wagon type ACT 1 and. Awarded by Sushila Transport Pvt. Ltd",
      "value_text": "Rs. 41.47 crores",
      "counterparty": "Sushila Transport Pvt. Ltd",
      "source_filing": "https://nsearchives.nseindia.com/corporate/TEXRAIL_01042026212502_TexRailOrderwin01042026.pdf",
      "company_page": "https://withriver.in/won/TEXRAIL"
    },
    {
      "symbol": "UTKARSHBNK",
      "company_name": null,
      "kind": "statement",
      "said_on": "2026-05-15",
      "due_on": "2026-12-31",
      "date_basis": "Q2/Q3 FY27",
      "date_is_approximate": false,
      "statement": "The bank is also in the process of launching new CBS in quarter 2/3 of FY '27.",
      "value_text": null,
      "counterparty": null,
      "source_filing": null,
      "company_page": "https://withriver.in/won/UTKARSHBNK"
    }
  ],
  "other_months": [
    {
      "period": "2028-10",
      "commitments": 9,
      "url": "https://withriver.in/clock/2028-10",
      "data": "https://withriver.in/clock/2028-10/data.json"
    },
    {
      "period": "2028-09",
      "commitments": 14,
      "url": "https://withriver.in/clock/2028-09",
      "data": "https://withriver.in/clock/2028-09/data.json"
    },
    {
      "period": "2028-08",
      "commitments": 15,
      "url": "https://withriver.in/clock/2028-08",
      "data": "https://withriver.in/clock/2028-08/data.json"
    },
    {
      "period": "2028-07",
      "commitments": 8,
      "url": "https://withriver.in/clock/2028-07",
      "data": "https://withriver.in/clock/2028-07/data.json"
    },
    {
      "period": "2028-06",
      "commitments": 8,
      "url": "https://withriver.in/clock/2028-06",
      "data": "https://withriver.in/clock/2028-06/data.json"
    },
    {
      "period": "2028-05",
      "commitments": 17,
      "url": "https://withriver.in/clock/2028-05",
      "data": "https://withriver.in/clock/2028-05/data.json"
    },
    {
      "period": "2028-04",
      "commitments": 20,
      "url": "https://withriver.in/clock/2028-04",
      "data": "https://withriver.in/clock/2028-04/data.json"
    },
    {
      "period": "2028-03",
      "commitments": 45,
      "url": "https://withriver.in/clock/2028-03",
      "data": "https://withriver.in/clock/2028-03/data.json"
    },
    {
      "period": "2028-02",
      "commitments": 13,
      "url": "https://withriver.in/clock/2028-02",
      "data": "https://withriver.in/clock/2028-02/data.json"
    },
    {
      "period": "2028-01",
      "commitments": 7,
      "url": "https://withriver.in/clock/2028-01",
      "data": "https://withriver.in/clock/2028-01/data.json"
    },
    {
      "period": "2027-12",
      "commitments": 12,
      "url": "https://withriver.in/clock/2027-12",
      "data": "https://withriver.in/clock/2027-12/data.json"
    },
    {
      "period": "2027-11",
      "commitments": 13,
      "url": "https://withriver.in/clock/2027-11",
      "data": "https://withriver.in/clock/2027-11/data.json"
    },
    {
      "period": "2027-10",
      "commitments": 17,
      "url": "https://withriver.in/clock/2027-10",
      "data": "https://withriver.in/clock/2027-10/data.json"
    },
    {
      "period": "2027-09",
      "commitments": 35,
      "url": "https://withriver.in/clock/2027-09",
      "data": "https://withriver.in/clock/2027-09/data.json"
    },
    {
      "period": "2027-08",
      "commitments": 27,
      "url": "https://withriver.in/clock/2027-08",
      "data": "https://withriver.in/clock/2027-08/data.json"
    },
    {
      "period": "2027-07",
      "commitments": 23,
      "url": "https://withriver.in/clock/2027-07",
      "data": "https://withriver.in/clock/2027-07/data.json"
    },
    {
      "period": "2027-06",
      "commitments": 28,
      "url": "https://withriver.in/clock/2027-06",
      "data": "https://withriver.in/clock/2027-06/data.json"
    },
    {
      "period": "2027-05",
      "commitments": 19,
      "url": "https://withriver.in/clock/2027-05",
      "data": "https://withriver.in/clock/2027-05/data.json"
    },
    {
      "period": "2027-04",
      "commitments": 20,
      "url": "https://withriver.in/clock/2027-04",
      "data": "https://withriver.in/clock/2027-04/data.json"
    },
    {
      "period": "2027-03",
      "commitments": 271,
      "url": "https://withriver.in/clock/2027-03",
      "data": "https://withriver.in/clock/2027-03/data.json"
    },
    {
      "period": "2027-02",
      "commitments": 15,
      "url": "https://withriver.in/clock/2027-02",
      "data": "https://withriver.in/clock/2027-02/data.json"
    },
    {
      "period": "2027-01",
      "commitments": 28,
      "url": "https://withriver.in/clock/2027-01",
      "data": "https://withriver.in/clock/2027-01/data.json"
    },
    {
      "period": "2026-12",
      "commitments": 54,
      "url": "https://withriver.in/clock/2026-12",
      "data": "https://withriver.in/clock/2026-12/data.json"
    },
    {
      "period": "2026-11",
      "commitments": 33,
      "url": "https://withriver.in/clock/2026-11",
      "data": "https://withriver.in/clock/2026-11/data.json"
    },
    {
      "period": "2026-10",
      "commitments": 28,
      "url": "https://withriver.in/clock/2026-10",
      "data": "https://withriver.in/clock/2026-10/data.json"
    },
    {
      "period": "2026-09",
      "commitments": 60,
      "url": "https://withriver.in/clock/2026-09",
      "data": "https://withriver.in/clock/2026-09/data.json"
    },
    {
      "period": "2026-08",
      "commitments": 28,
      "url": "https://withriver.in/clock/2026-08",
      "data": "https://withriver.in/clock/2026-08/data.json"
    },
    {
      "period": "2026-07",
      "commitments": 10,
      "url": "https://withriver.in/clock/2026-07",
      "data": "https://withriver.in/clock/2026-07/data.json"
    },
    {
      "period": "2026-06",
      "commitments": 18,
      "url": "https://withriver.in/clock/2026-06",
      "data": "https://withriver.in/clock/2026-06/data.json"
    },
    {
      "period": "2026-05",
      "commitments": 11,
      "url": "https://withriver.in/clock/2026-05",
      "data": "https://withriver.in/clock/2026-05/data.json"
    },
    {
      "period": "2026-04",
      "commitments": 2,
      "url": "https://withriver.in/clock/2026-04",
      "data": "https://withriver.in/clock/2026-04/data.json"
    },
    {
      "period": "2026-03",
      "commitments": 6,
      "url": "https://withriver.in/clock/2026-03",
      "data": "https://withriver.in/clock/2026-03/data.json"
    }
  ]
}